www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date January 15th, 2021 @ 2:34 p.m. through bid opening date

Griffith‐Vanguard Joint Venture
is seeking DBE Qualified Sub-Contractors on the following Project

Project Owner: Caltrans No. 08-0K1224

San Bernardino County In Hesperia And Victorville From Oak Hill Road Overcrossing To 0.1 Mile South Of Bear Valley Road Overcrossing

Lead Estimator: Scott McLure, Estimator / Jason Muller Email: smclure@griffithcompany.net jmuller@vc‐inc.net
DBE Goal: 11% Estimate: $140,000,000
General work description: Replace PCC and AC pavement with JPCP and HMA pavement.
Bids open Tuesday, February 9, 2021 @ 2:00 PM
Bids open Tuesday, April 13, 2021 @ 2:00 PM

Bids open Thursday, August 05, 2021 @ 2:00 PM
Bids open Tuesday, August 24, 2021 @ 2:00 PM

*** Addendum 1 issued 12/18/2020***
*** Addendum 2 issued 01/20/2021***
*** Addendum 3 issued 01/22/2021***
*** Addendum 4 issued 01/29/2021***
*** Addendum 5 issued 02/04/2021***
*** Addendum 6 issued 04/09/2021***
*** Addendum 7 issued 07/08/2021***
*** Addendum 8 issued 07/22/2021***
*** Addendum 9 issued 07/27/2021***
*** Addendum 10 issued 08/16/2021***
*** Addendum 11 issued 08/19/2021***
Please visit the Caltrans site to view these addendums:

Plans and Specs: https://www.dropbox.com/sh/b787k2nkud6pgz7/AACfEIieHjkyanxNEaHQ8TROa?dl=0

Griffith-Vanguard Joint Venture is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: LEAD COMPLIANCE PLAN, PROGRESS SCHEDULE, TIME-RELATED OVERHEAD, RENEWABLE DIESEL EQUIPMENT VERIFICATION, DISPUTE RESOLUTION BOARD ON-SITE MEETING, HOURLY OFF-SITE DISPUTE-RESOLUTION-BOARD-RELATED TASKS, DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TYPE III BARRICADE, TEMPORARY TRAFFIC STRIPE (PAINT), CHANNELIZER (SURFACE MOUNTED), PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY, TEMPORARY PAVEMENT MARKER, TEMPORARY PEDESTRIAN ACCESS ROUTE, PORTABLE CHANGEABLE MESSAGE SIGN (EA), TEMPORARY RAILING (TYPE K), ARMORGUARD TEMPORARY BARRIER SYSTEM, TEMPORARY CRASH CUSHION MODULE, ALTERNATIVE TEMPORARY CRASH CUSHION, TEMPORARY TRAFFIC SCREEN, TEMPORARY RADAR SPEED FEEDBACK SIGN SYSTEM, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, TEMPORARY SOIL BINDER, TEMPORARY FIBER ROLL, TEMPORARY GRAVEL BAG BERM, TEMPORARY CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, TREATED WOOD WASTE, REMOVE CONCRETE (CY), TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, ROADSIDE CLEARING, ROCK BLANKET, 12" CORRUGATED HIGH DENSITY POLYETHYLENE PIPE CONDUIT, ROLLED EROSION CONTROL PRODUCT (BLANKET), HYDROSEED, CLASS 2 AGGREGATE SUBBASE, CLASS 2 AGGREGATE BASE (CY), PRIME COAT, HOT MIX ASPHALT (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE A, C, E, F), PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), TACK COAT, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT, JOINTED PLAIN CONCRETE PAVEMENT, JOINTED PLAIN CONCRETE PAVEMENT WITH INTERMEDIATE STRENGTH CONCRETE, DRILL AND BOND (DOWEL BAR), JOINT SEAL (PREFORMED COMPRESSION), ISOLATION JOINT SEAL (SILICONE), REMOVE CONCRETE PAVEMENT AND BASE, AGGREGATE BASE (APPROACH SLAB), STRUCTURAL CONCRETE, APPROACH SLAB (TYPE R) / (HEADWALL) / (DRAINAGE INLET), MINOR CONCRETE (MINOR STRUCTURE), PAVING NOTCH EXTENSION, DRILL AND BOND DOWEL, JOINT SEAL (MR 1"), BRIDGE REMOVAL (PORTION), BRIDGE JOINT RESTRAINER (CABLE TYPE), ALTERNATIVE PIPE CULVERT (18”, 24”, 30”, 36”), 48" REINFORCED CONCRETE PIPE, 8" ALTERNATIVE PIPE DOWNDRAIN, 48" CORRUGATED STEEL PIPE RISER (.079" THICK), ALTERNATIVE FLARED END SECTION (18”, 24”, 36”), 36" PRECAST CONCRETE PIPE INLET, 18" ALTERNATIVE PIPE RISER, ABANDON CULVERT (LF), REMOVE OVERSIDE DRAIN, REMOVE CULVERT (LF), REMOVE DOWNDRAIN (EA), REMOVE INLET, REMOVE HEADWALL, REMOVE FLARED END SECTION (EA), ADJUST INLET, REMOVE CONCRETE (CHANNEL), CAP INLET, CLEANING, INSPECTING, AND PREPARING CULVERT (LF), CULVERT SLURRY-CEMENT BACKFILL, SAND BACKFILL, MACHINE SPIRAL WOUND PVC PIPELINER (GROUTED, 30" / GROUTED, 36" / GROUTED, 42"), 18" MACHINE SPIRAL WOUND PVC PIPELINER (EXPANDABLE DIAMETER), 66" WELDED STEEL PIPELINER, CONCRETE (CHANNEL LINING), ROCK SLOPE PROTECTION ( 60 LB, CLASS II, METHOD B / 20 LB, CLASS I, METHOD B / 1/2 T, CLASS VII, METHOD B), ROCK SLOPE PROTECTION FABRIC (CLASS 8), MINOR CONCRETE (GUTTER), DETECTABLE WARNING SURFACE, MINOR CONCRETE (MISCELLANEOUS CONSTRUCTION / EXPOSED AGGREGATE CONCRETE / CURB, GUTTER, SIDEWALK AND DRIVEWAY / CURB, SIDEWALK AND CURB RAMP / CURB, GUTTER, AND SIDEWALK), PRE/POST CONSTRUCTION SURVEYS, MISCELLANEOUS IRON AND STEEL, CHAIN LINK FENCE (TYPE CL-6), REMOVE FENCE, REMOVE PAVEMENT MARKER, REMOVE DELINEATOR, DELINEATOR (CLASS 1), GUARD RAILING DELINEATOR, PAVEMENT MARKER (RETROREFLECTIVE-RECESSED), OBJECT MARKER (TYPE L-1), REMOVE ROADSIDE SIGN, FURNISH LAMINATED PANEL SIGN (1"-TYPE A), FURNISH SINGLE SHEET ALUMINUM SIGN, ROADSIDE SIGN, INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD), MIDWEST GUARDRAIL SYSTEM (STEEL POST), VEGETATION CONTROL (MINOR CONCRETE), SINGLE THRIE BEAM BARRIER, DOUBLE THRIE BEAM BARRIER, CABLE RAILING, TRANSITION RAILING (TYPE WB-31), END ANCHOR ASSEMBLY (TYPE SFT), ALTERNATIVE IN-LINE TERMINAL SYSTEM, SEVERE-DUTY CRASH CUSHION, CONCRETE BARRIER, REMOVE BARRIER, REMOVE GUARDRAIL, SALVAGE METAL BRIDGE RAILING, PAINT TRAFFIC STRIPE (1-COAT), REMOVE THERMOPLASTIC PAVEMENT MARKING, 12" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT), 12" RUMBLE STRIP (CONCRETE PAVEMENT), 6" METHYL METHACRYLATE PAINT TRAFFIC STRIPE, 8" METHYL METHACRYLATE PAINT TRAFFIC STRIPE, 12" METHYL METHACRYLATE PAINT TRAFFIC STRIPE, METHYL METHACRYLATE PAINT TRAFFIC STRIPE CROSSWALK AND PAVEMENT MARKING, REMOVE 6" TRAFFIC STRIPE, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, CAMERA SYSTEMS, FIBER OPTIC CABLE SYSTEMS, TEMPORARY LIGHTING SYSTEMS, MODIFYING LIGHTING SYSTEMS, MODIFYING SIGNAL AND LIGHTING SYSTEMS, MODIFYING RAMP METERING SYSTEMS, MODIFYING TRAFFIC MONITORING STATIONS, MODIFYING INTERCONNECTION CONDUIT AND CABLE, REMOVING ROADWAY WEATHER INFORMATION SYSTEM, REMOVING LIGHTING SYSTEMS, MOBILIZATION, TRUCKING.

Requirements: Griffith-Vanguard Joint Venture is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and Carpenters Unions. 100% performance and payment bonds required for the full amount of the subcontract price. Subcontractors must possess a current contractor’s license, insurance and worker’s compensation insurance coverage meeting Griffith-Vanguard Joint Venture requirements. A copy of the insurance requirements and agreements can be obtained by contacting the Estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies. Griffith-Vanguard Joint Venture intends to work cooperatively with all qualified firms seeking work on this project. Griffith-Vanguard Joint Venture is an Equal Opportunity Employer.

Published on January 15th, 2021 @ 2:34 p.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME