Advertisement date December 7th, 2017 @ 10:50 a.m. through bid opening date

USS Cal Builders is seeking qualified DBE subcontractors, suppliers and firms to meet or exceed the 13% goal for the      
07-293704 CONSTRUCTION ON STATE HIGHWAY IN LA COUNTY IN & NEAR CARSON ON ROUTE 110 FROM 0.2 MILE NORTH OF TORRANCE BLVD UNDERCROSSING TO 190TH ST UNDERCROSSING & ON ROUTE 405 FROM MAIN ST UNDERCROSSING TO 190TH ST UNDERCROSSING (RE-BID) Project.

 

Bid Date and Time:

January 23, 2018 at 2:00 PM

Engineer’s Estimate:

$21.3 Million

Estimator’s Name:

Jim Larrea

Email Address:

bidding@usscalbuilders.com

Estimator's Phone:

(714) 828-4882 ext 3

Estimator’s Fax:

(714) 503-6805

Plans and Specs Link:

http://www.dot.ca.gov/des/oe/weekly-ads/plans.php?id=07-293704

 

The Work includes, but is not limited to: : LEAD COMPLIANCE PLAN, PROGRESS SCHEDULE (CRITICAL PATH METHOD), TIME-RELATED OVERHEAD (WDAY), CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, CHANNELIZER (SURFACE MOUNTED), TEMPORARY RAILING (TYPE K), TEMPORARY CRASH CUSHION MODULE, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL), TEMPORARY HYDRAULIC MULCH, TEMPORARY COVER, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY SILT FENCE, TEMPORARY CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE), TREATED WOOD WASTE, REMOVE CONCRETE (CY), REMOVE CONCRETE (STRUCTURE), CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, ROADWAY EXCAVATION (TYPE Y-1) (AERIALLY DEPOSITED LEAD), STRUCTURE EXCAVATION (RETAINING WALL), STRUCTURE EXCAVATION (SOIL NAIL WALL), STRUCTURE EXCAVATION (GROUND ANCHOR WALL), STRUCTURE BACKFILL (RETAINING WALL), STRUCTURE BACKFILL (GROUND ANCHOR WALL), STRUCTURE BACKFILL (SOIL NAIL WALL), DITCH EXCAVATION, IMPORTED BORROW (CY), ROADSIDE CLEARING, ROCK BLANKET, SLOW-RELEASE FERTILIZER, PLANT (GROUP H), PLANT (GROUP B), PLANT (GROUP U), MAINTAIN EXISTING PLANTED AREAS, PLANT ESTABLISHMENT WORK, WOOD MULCH, CHECK AND TEST EXISTING IRRIGATION FACILITIES, OPERATE EXISTING IRRIGATION FACILITIES, REMOVE IRRIGATION FACILITY, CONTROL AND NEUTRAL CONDUCTORS, 3/4" REMOTE CONTROL VALVE, 1 1/2" REMOTE CONTROL VALVE, 2" REMOTE CONTROL VALVE, RISER SPRINKLER ASSEMBLY (GEAR DRIVEN), RISER SPRINKLER ASSEMBLY, 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1 1/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), BALL VALVE, 8" WELDED STEEL PIPE CONDUIT, COMPOST (CY), INCORPORATE MATERIALS, CLASS 3 AGGREGATE BASE (CY), LEAN CONCRETE BASE, LEAN CONCRETE BASE RAPID SETTING, BASE BOND BREAKER, HOT MIX ASPHALT (TYPE A), RUBBERIZED HOT MIX ASPHALT (GAP GRADED), PLACE HOT MIX ASPHALT DIKE (TYPE C), PLACE HOT MIX ASPHALT DIKE (TYPE E), PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), TACK COAT, COLD PLANE ASPHALT CONCRETE PAVEMENT, JOINTED PLAIN CONCRETE PAVEMENT, JOINTED PLAIN CONCRETE PAVEMENT (RSC), DRILL AND BOND (DOWEL BAR), DRILL AND BOND (TIE BAR), ISOLATION JOINT SEAL (PREFORMED COMPRESSION), GROUND ANCHOR (SUBHORIZONTAL), RESEARCH GROUND ANCHOR, SOIL NAIL, 60" CAST-IN-DRILLED-HOLE CONCRETE PILE (SIGN FOUNDATION), STRUCTURAL CONCRETE, RETAINING WALL, STRUCTURAL CONCRETE, BOX CULVERT, STRUCTURAL CONCRETE, HEADWALL, STRUCTURAL CONCRETE, DRAINAGE INLET, STRUCTURAL CONCRETE, FASCIA, MINOR CONCRETE (MINOR STRUCTURE), MINOR CONCRETE (BACKFILL), CONCRETE SURFACE TEXTURE (RIVER ROCK AND BUSH HAMMER), BAR REINFORCING STEEL, BAR REINFORCING STEEL (RETAINING WALL), BAR REINFORCING STEEL (BOX CULVERT), BAR REINFORCING STEEL (FASCIA), STRUCTURAL SHOTCRETE, FURNISH SIGN STRUCTURE (TRUSS), INSTALL SIGN STRUCTURE (TRUSS), REMOVE SIGN STRUCTURE (EA), 12" REINFORCED CONCRETE PIPE, 18" REINFORCED CONCRETE PIPE, 24" REINFORCED CONCRETE PIPE, 27" REINFORCED CONCRETE PIPE, GRATED LINE DRAIN, 36" PRECAST CONCRETE PIPE MANHOLE, ABANDON PIPELINE (LF), REMOVE PIPE (LF), REMOVE INLET, REMOVE HEADWALL, REMOVE CONCRETE (CHANNEL), SAND BACKFILL, REMOVE SLOPE PAVING (SQYD), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD A) (CY), MINOR CONCRETE (GUTTER) (LF), MINOR CONCRETE (CROSS GUTTER) (RSC), MINOR CONCRETE (CURB AND GUTTER), MINOR CONCRETE (ISLAND PAVING), REMOVE CONCRETE (CURB AND GUTTER), MISCELLANEOUS IRON AND STEEL, MISCELLANEOUS METAL, PREPARE AND PAINT CONCRETE, CHAIN LINK FENCE (TYPE CL-6), 4' CHAIN LINK GATE (TYPE CL-6), CHAIN LINK FENCE (TYPE CL-8, EXTENSION ARM), REMOVE CHAIN LINK FENCE, REMOVE PAVEMENT MARKER, DELINEATOR (CLASS 1), PAVEMENT MARKER (RETROREFLECTIVE), REMOVE ROADSIDE SIGN (WOOD POST), REMOVE ROADSIDE SIGN (STRAP AND SADDLE BRACKET METHOD), REMOVE ROADSIDE SIGN PANEL, FURNISH FORMED PANEL SIGN (OVERHEAD) FOR RETROREFLECTIVE SHEETING (TYPE XI), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-FRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-FRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI), RETROREFLECTIVE SHEETING, (TYPE XI), METAL (BARRIER MOUNTED SIGN), ROADSIDE SIGN - ONE POST, ROADSIDE SIGN - TWO POST, INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD), MIDWEST GUARDRAIL SYSTEM, VEGETATION CONTROL (MINOR CONCRETE), CABLE RAILING, TRANSITION RAILING (TYPE WB-31), END ANCHOR ASSEMBLY (TYPE SFT), SOFTSTOP TERMINAL SYSTEM, ALTERNATIVE IN-LINE TERMINAL SYSTEM, ALTERNATIVE FLARED TERMINAL SYSTEM, CRASH CUSHION (TYPE SCI-100GM), CRASH CUSHION (TYPE SCI-70GM), PORTABLE CONCRETE BARRIER (TYPE 60K), CONCRETE BARRIER (TYPE 60F), CONCRETE BARRIER (TYPE 60), CONCRETE BARRIER (TYPE 60GE), CONCRETE BARRIER (TYPE 732B MODIFIED), CONCRETE BARRIER (TYPE 736A), CONCRETE BARRIER (TYPE 736B MODIFIED), CONCRETE BARRIER (TYPE 60D MODIFIED), REMOVE GUARDRAIL, 6" THERMOPLASTIC TRAFFIC STRIPE, 8" THERMOPLASTIC TRAFFIC STRIPE, 8" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 12-3), THERMOPLASTIC PAVEMENT MARKING, 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 6-1), 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 36-12), 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 17-7), REMOVE THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOPLASTIC PAVEMENT MARKING, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, SIGNAL AND LIGHTING SYSTEM, MODIFYING EXISTING ELECTRICAL SYSTEM.

 

If requested, USS Cal Builders can assist subs in obtaining bonds, lines of credit and insurance in the preparation of this
project. USS Cal can also assist in obtaining equipment, supplies, materials or related assistance or services in the preparation of this project. USS Cal is relying on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope found in the plans, specifications and addenda regardless of any qualifying language in the proposal. USS Cal's listing of a subcontractor is not an acceptance of any or all of that subcontractor's conditions, qualifications, exclusions or exceptions included in the subcontractor's bid proposal. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor's bid must remain valid with the owner, as specified in the project's specifications.

Each listed subcontractor must execute USS Cal's standard subcontract agreement if USS Cal is awarded the project; the standard subcontract is available for review on USS Cal's website (www.usscalbuilders.com ) and at USS Cal's office. At the discretion of USS Cal, any listed subcontractor that withdraws its bid after USS Cal submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor.

This is a prevailing wage project. If this project is subject to a Project Labor Agreement or Project Stabilization Agreement, you will be required to honor the terms of such agreement. USS Cal Builders, Inc. is signatory to the Carpenter's Union. Any subcontractor performing carpentry work must be signatory to the Carpenter's Union.

An Equal Opportunity Employer.

Bidding Department
USS Cal Builders Inc.

8051 Main Street, Stanton, CA 90680

License # 654454

www.usscalbuilders.com

 

Published on December 7th, 2017 @ 10:50 a.m.. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME