Advertisement date December 7th, 2017 @ 10:32 a.m. through bid opening date

USS Cal Builders is seeking qualified DBE subcontractors, suppliers and firms to meet or exceed the 12%  goal for the
07-300804 CONSTRUCTION ON STATE HIGHWAY IN LOS ANGELES COUNTY IN LOS ANGELES FROM ROUTE 5/101 SEPARATION TO 0.1 MILE NORTH OF BEAUDRY AVENUE UNDERCROSSING Project.

 

Bid Date and Time:

JANUARY 18, 2017 AT 2PM

Engineer’s Estimate:

$6.9 MILLION

Estimator’s Name:

JIM LARREA

Email Address:

bidding@usscalbuilders.com

Estimator's Phone:

(714) 828-4882 Ext. 3

Estimator’s Fax:

(714) 503-6805

Plans and Specs Link:

http://www.dot.ca.gov/des/oe/weekly-ads/plans.php?id=07-300804

 

The Work includes, but is not limited to: LEAD COMPLIANCE PLAN, PROGRESS SCHEDULE (CRITICAL PATH METHOD), TIME-RELATED OVERHEAD (WDAY), CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, CHANNELIZER (SURFACE MOUNTED), TEMPORARY TERMINAL SECTION (TYPE K), TEMPORARY RAILING (TYPE K), TEMPORARY CRASH CUSHION MODULE, JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, TEMPORARY EROSION CONTROL BLANKET, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY GRAVEL BAG BERM, TEMPORARY CONCRETE WASHOUT, REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE), TREATED WOOD WASTE, ROADWAY EXCAVATION, ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD), MAINTAIN EXISTING PLANTED AREAS, CHECK AND TEST EXISTING IRRIGATION FACILITIES, OPERATE EXISTING IRRIGATION FACILITIES, REMOVE IRRIGATION FACILITY, CONTROL AND NEUTRAL CONDUCTORS, 1" REMOTE CONTROL VALVE, 1 1/2" REMOTE CONTROL VALVE, POP-UP SPRINKLER ASSEMBLY (GEAR DRIVEN), 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1 1/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 2 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 3" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), BALL VALVE, CLASS 3 AGGREGATE BASE (CY), LEAN CONCRETE BASE RAPID SETTING, REPLACE BASE, BASE BOND BREAKER, HOT MIX ASPHALT (TYPE A), RUBBERIZED HOT MIX ASPHALT (GAP GRADED), PLACE HOT MIX ASPHALT DIKE (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE C), TACK COAT, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT, JOINTED PLAIN CONCRETE PAVEMENT (RSC), PLACE DOWEL BARS, INDIVIDUAL SLAB REPLACEMENT (RSC), REMOVE CONCRETE PAVEMENT (CY), GRIND EXISTING CONCRETE PAVEMENT, STRUCTURAL CONCRETE, BRIDGE, STRUCTURAL CONCRETE, APPROACH SLAB (TYPE R), MINOR CONCRETE (MINOR STRUCTURE), DRILL AND BOND DOWEL, CLEAN EXPANSION JOINT, JOINT SEAL (MR 1"), BAR REINFORCING STEEL (BRIDGE), REPAIR SPALLED SURFACE AREA, BRIDGE REMOVAL (PORTION), PAINT BRIDGE IDENTIFICATION, ADJUST MANHOLE TO GRADE, DETECTABLE WARNING SURFACE, MINOR CONCRETE (CURB, SIDEWALK AND CURB RAMP), REMOVE CONCRETE SIDEWALK (SQYD), REMOVE CONCRETE (CURB AND GUTTER), PRE/POST CONSTRUCTION SURVEYS, MISCELLANEOUS IRON AND STEEL, REMOVE PAVEMENT MARKER, DELINEATOR (CLASS 1), GUARD RAILING DELINEATOR, PAVEMENT MARKER (RETROREFLECTIVE), MIDWEST GUARDRAIL SYSTEM (WOOD POST), VEGETATION CONTROL (MINOR CONCRETE), TRANSITION RAILING (TYPE WB-31), END CAP (TYPE A), END ANCHOR ASSEMBLY (TYPE SFT), TERMINAL SYSTEM (TYPE SOFTSTOP), ALTERNATIVE FLARED TERMINAL SYSTEM, REMOVE GUARDRAIL, 6" THERMOPLASTIC TRAFFIC STRIPE, 8" THERMOPLASTIC TRAFFIC STRIPE, 8" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 12-3), THERMOPLASTIC PAVEMENT MARKING, 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 17-7), 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 18-12), PAINT TRAFFIC STRIPE (2-COAT), REMOVE THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOPLASTIC PAVEMENT MARKING, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, MODIFYING EXISTING ELECTRICAL SYSTEM.

For detailed line items, please go to: http://www.dot.ca.gov/des/oe/weekly-ads/oe-biditems.php?q=07-300804

If requested, USS Cal Builders can assist subs in obtaining bonds, lines of credit and insurance in the preparation of this
project. USS Cal can also assist in obtaining equipment, supplies, materials or related assistance or services in the preparation of this project. USS Cal is relying on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope found in the plans, specifications and addenda regardless of any qualifying language in the proposal. USS Cal's listing of a subcontractor is not an acceptance of any or all of that subcontractor's conditions, qualifications, exclusions or exceptions included in the subcontractor's bid proposal. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor's bid must remain valid with the owner, as specified in the project's specifications.

Each listed subcontractor must execute USS Cal's standard subcontract agreement if USS Cal is awarded the project; the standard subcontract is available for review on USS Cal's website (www.usscalbuilders.com ) and at USS Cal's office. At the discretion of USS Cal, any listed subcontractor that withdraws its bid after USS Cal submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor.

This is a prevailing wage project. If this project is subject to a Project Labor Agreement or Project Stabilization Agreement, you will be required to honor the terms of such agreement. USS Cal Builders, Inc. is signatory to the Carpenter's Union. Any subcontractor performing carpentry work must be signatory to the Carpenter's Union.

An Equal Opportunity Employer.

Bidding Department
USS Cal Builders Inc.

8051 Main Street, Stanton, CA 90680

License # 654454

www.usscalbuilders.com

 

Published on December 7th, 2017 @ 10:32 a.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME