www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002

CE Focus - Focus Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date November 16, 2023 @ 4:30 p.m. through bid opening date

 

Caliba Inc. An Equal Opportunity Employer is seeking qualified DVBE subcontractors, suppliers for the following

Bid Date & Time:

November 29, 2023, at 2:00 PM

Project Owner:

Santa Monica - Malibu Unified School District | BID NO.: 24.14.SMS

Project: John Adams MS Library Renovation project

Wage Determination

Prevailing Wage

Location: Santa Monica Los Angeles CA

Contact:

Bidding Dept.

Email Address:

bidding@calibainc.com

Estimator's Phone:

(714) 886-2887

Estimator’s Fax:

(714) 503-6805

Plans and Specs Link:

https://drive.google.com/drive/folders/13RrlESAjcrGVqTe5e15ikkAvz8Gl_w1k?usp=sharing

Please see the NIB or Specification section for the subcontractor’s prequalification requirements.

Scope: Abatement and demo of acoustical ceilings and wall tiles and replace with new acoustical T-Bar ceilings with new ductwork registers and pendant lighting, Replacement of flooring, add new framing and roof penetrations for new rooftop HVAC package units on curbs and reconfigure ductwork, New Casework, New Doors, door frames, Hardware and salto access control, New Store front windows and doors, new Mecho shades to the old and new windows and storefronts, Patching and painting of new and existing walls and casework, Demolish exterior stairs and install new concrete ramp and stairs and install new Lunberock deck in courtyard and install new shade shelter over the new deck, Install a Hi-Low drinking Fountain and other associated improvements per bidding documents.

Caliba Inc. requires 100% Performance & Payment Bonds. If requested, and as Caliba Inc. way of assisting subs in obtaining bonds, lines of credit and insurance in the preparation of this project, we can initiate introduction to agents known to us. Caliba Inc. can also assist in obtaining equipment, supplies, materials or related assistance or services in the preparation of this project. Caliba Inc. is relying on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope found in the plans, specifications and addenda regardless of any qualifying language in the proposal. Caliba Inc.'s listing of a subcontractor is not an acceptance of any or all of that subcontractor's conditions, qualifications, exclusions or exceptions included in the subcontractor's bid proposal. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor's bid must remain valid with the owner, as specified in the project's specifications. Each listed subcontractor must execute Caliba Inc. standard subcontract agreement if Caliba Inc. is awarded the project; the standard subcontract is available for review at Caliba Inc.’s office. At the discretion of Caliba Inc., any listed subcontractor that withdraws its bid after Caliba Inc. submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor. Include with your bid the Time required for Performance of your work and any Delivery Schedules so that we can establish a Flexible Timeframe for your work. This is a prevailing wage project. If this project is subject to a Project Labor Agreement or Project Stabilization Agreement, you will be required to honor the terms of such agreement.

Caliba Inc.
8031 Main Street, Stanton, CA 90680
Phone: 714-886-2887 Fax: 714-503-6805
An Equal Opportunity Employer

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.
 
NEWS
&
EVENTS

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 
What are we about? Contact us HOME