Contractors Estimate.com
Saving contractors time and money by delivering complete bid estimates.

 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS
Advertisement date: November 1st, 2017 @ 12:11 p.m. through bid opening date

An Equal Opportunity Employer
Is requesting quotations from all qualified DBE subcontractors and material suppliers for the following project:

Agency: Caltrans

Caltrans Project No. 07-296404 Federal Aid No. ACNH-X037(202)E

Project Name: FOR CONSTRUCTION ON STATE HIGHWAY IN LOS ANGELES
COUNTY IN LOS ANGELES ON ROUTE 5 FROM EUCLID AVENUE UNDERCROSSING TO SEVENTH STREET OVERCROSSING AND ON ROUTE 10 FROM LA RIVER TO ROUTE 5 AND ON ROUTE 60 FROM SOTO STREET UNDERCROSSING TO EAST OF EUCLID AVENUE UNDERCROSSING.

District-County-Route-Post Mile: 07-LA-5, 10, 60-16.1/17.0, 18.1/18.4, 0.4/R1.0

      Project Description: Place rock blanket, minor concrete, and weed control mat.

DBE Goal: 13 %

Location: LOS ANGELES COUNTY

Bid Date: Tuesday, December 19, 2017

http://www.dot.ca.gov/des/oe/weekly-ads/plans.php?id=07-296404

This request includes, but is not limited to, the following:
Lead Compliance Plan, Progress Schedule, Construction Area Signs, Traffic Control System, Channelizer (Surface Mounted), Temporary Railing (Type K), Temporary Crash Cushion Module, Temporary Crash Cushion (Absorb-350), Job Site Management, Prepare Storm Water Pollution Prevention Plan, Rain Event Action Plan, Storm Water Sampling And Analysis Day, Storm Water Annual Report, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Silt Fence, Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Treated Wood Waste, Remove Concrete, Temporary High-Visibility Fence, Roadway Excavation, Roadway Excavation (Type Z-2) (Aerially Deposited Lead), Roadway Excavation (Type Z-3) (Aerially Deposited Lead), Ditch Excavation (Type Z-2) (Aerially Deposited Lead), Ditch Excavation (Type Z-3) (Aerially Deposited Lead), Roadside Clearing, Rock Blanket, Slow-Release Fertilizer, Weed Control Mat (Fiber), Plant (Group H), Plant (Group A), Plant (Group B), Plant (Group U), Maintain Existing Planted Areas, Plant Establishment Work, Wood Mulch, Check And Test Existing Irrigation Facilities, Operate Existing Irrigation Facilities, Remove Irrigation Facility, Salvage Irrigation Facility, Control And Neutral Conductors, 1" Remote Control Valve, 1 1/2" Remote Control Valve, 2" Remote Control Valve, 2 1/2" Remote Control Valve, 16-18 Station Irrigation Controller, 1" Galvanized Steel Pipe (Supply Line), 1 1/2" Galvanized Steel Pipe (Supply Line), 2" Galvanized Steel Pipe (Supply Line), 2 1/2" Galvanized Steel Pipe (Supply Line), Irrigation Controller Enclosure Cabinet, 2 1/2" Backflow Preventer Assembly, Backflow Preventer Enclosure, Flow Sensor, Riser Sprinkler Assembly (Gear Driven), Riser Sprinkler Assembly, 1" Gate Valve, 2 1/2" Gate Valve, 3/4" Plastic Pipe (Schedule 40) , 1" Plastic Pipe (Schedule 40), 1 1/4" Plastic Pipe (Schedule 40), 1 1/2" Plastic Pipe (Schedule 40), 2" Plastic Pipe (Schedule 40), 2 1/2" Plastic Pipe (Schedule 40), 3" Plastic Pipe (Schedule 40), Ball Valve, Pvc Pipe Conduit (Sleeve), 12" Corrugated High Density Polyethylene Pipe Conduit, 8" Welded Steel Pipe Conduit, 10" Welded Steel Pipe Conduit, Class 3 Aggregate Base (Cy), Lean Concrete Base, Hot Mix Asphalt (Type A), Place Hot Mix Asphalt Dike (Type A), Place Hot Mix Asphalt Dike (Type C), Place Hot Mix Asphalt Dike (Type E), Place Hot Mix Asphalt (Miscellaneous Area), Remove Asphalt Concrete Dike, Structural Concrete, Drainage Inlet, Minor Concrete (Minor Structure), 18" Reinforced Concrete Pipe, Rock Slope Protection, Rock Slope Protection Fabric (Class 8), Minor Concrete (Brushed Concrete), Minor Concrete (Stamped Concrete), Remove Concrete Curb, Remove Concrete (Curb And Gutter), Miscellaneous Metal, 16' Chain Link Gate (Type Cl-6), Reset Roadside Sign (One Post), Midwest Guardrail System, Vegetation Control (Minor Concrete), Transition Railing (Type Wb-31), End Cap (Type A), End Anchor Assembly (Type Sft), Alternative In-Line Terminal System, Alternative Flared Terminal System, Crash Cushion (Sci 100Gm), Concrete Barrier (Type 60), Concrete Barrier (Type 60C Mod), Concrete Barrier (Type 60Sd), Concrete Barrier Transition, Remove Guardrail, Remove Concrete Barrier, Thermoplastic Traffic Stripe (Enhanced Wet-Night Visibility) (Preformed), Maintaining Existing Traffic Management System Elements During Construction, Electric Service For Irrigation, Modifying Existing Electrical System, Mobilization.


Plans: Plans, specifications and project requirements may be reviewed at our office in Santa Ana. Copies of the contract documents are available from the Caltrans http://www.dot.ca.gov/des/oe/weekly-ads/plans.php?id=07-296404 ACCU Construction encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project.

Contractors and Subcontractors must register with D.I.R (Department of Industrial Relations) to bid on public works projects. To verify your status or to obtain a D.I.R number, please visit:
http;//dir.ca.gov/Public-Works/Contractors.html


ACCU Construction
2098 S. Grand Ave. Suite A
Santa Ana, CA 92705
Phone: 714-641-4730 Fax: 714-641-4704

 

Published on November 1st, 2017 @ 12:11 p.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME