www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002

CE Focus - Focus Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date October 19th, 2023 @ 8:40 a.m. through bid opening date

 

Griffith Company an Equal Opportunity Employer is requesting sub-bids from all qualified subcontractors and suppliers including certified DBE firms performing a commercially useful function for referenced project: 


Contracting Agency: City of Pomona | Invitation #2023-46
Project: Pomona Multi-Neighborhood Pedestrian and Bicycle Improvement Project
Bids open November 2, 2023, at 3:00 PM
DBE Goal:
23%

Scope of Services: The City of Pomona (the “City”) is soliciting bids from firms for Pomona Multi-Neighborhood Pedestrian and Bicycle Improvement

Plans & Specs can be viewed for free online at: https://www.dropbox.com/scl/fo/pljs0ycimo58lvh2ug41f/h?rlkey=9cu8yzk9yaabcm4oayb7hxd9o&dl=0

Griffith Company an Equal Opportunity Employer requests sub quotes from all qualified subcontractors and suppliers including certified DBE firms performing commercially useful function for the following items of work, including but not limited to: Mobilization, Clearing and Grubbing, Construction Survey and Monument Preservation, Compaction Testing, NPDES/Water Pollution Control/SWPPP, Traffic Control, Punch List Items, Unclassified Excavation and Embankment, Remove Sidewalk and Ramp, Remove Curb, Remove Curb and Gutter, Remove Concrete Pavement, Remove Concrete Pavement or Concrete Gutter Overlaid with AC, Remove Concrete Driveway, Remove Cross Gutter, Remove 30"x30" Catch Basin, Remove AC and Subgrade to a Depth of 4" Below Proposed Finished Surface, Remove AC and Subgrade to a Depth of 6" Below Proposed Finished Surface, Remove AC Pavement, Adjust Valve to Finished Surface, Adjust Manhole to Finished Surface (Double Adjust), Adjust Pull Box to Finished Surface, Relocate and Lower Water Meter and Replace Meter Box per City of Pomona Std. No. 11, Adjust Water Meter Box to Finished Surface, Relocate Fire Hydrant per City of Pomona Std. No. 2, Construct Residential Driveway per City of Pomona Std. No. A-27-10, Construct Sidewalk per City of Pomona Std. No. A-7-02, Construct ADA Curb Ramp per City of Pomona Std. No. A-28-10, Construct 8' x 12' Type A Passageway Per Caltrans Std Plan A88B., Construct Street Cross Gutter, PCC Pavement, Construct Concrete Paver, Remove Existing Tree., Construct Mountable Curb, Construct Truck Apron, Construct Curb and Gutter, Construct Cape Seal (Chip Seal + Type II Slurry) with Crack Fill and Crack Seal, Cold Mill AC and Fabric, with Crack Fill and Crack Seal, Construct AC, Construct FRARHM, Relocate Street Light.  Extend Conduits and Conductors to New Pole Location, Remove Existing Catch Basin. Includes Removal of Local Depression, Remove Existing RCP, Construct Curb Opening Catch Basin, Reconstruct Top Catch Basin, Construct Manhole per SPPWC Std. Plan 322-3.  Includes Removal of Existing Manhole and Stub Outs, Construct Local Depression, Construct RCP, 2000-D, Construct 12" PVC, Connect to Existing Pipe, Construct Concrete Collar, Construct Bulkhead, Construct Supports for Conduits Across Trenches per SPPWC Std. Plan 224-3, Case 1, Construct Supports for Conduits Across Trenches per SPPWC Std. Plan 224-3, Case 3, Construct Junction Structure, Pipe to Pipe per SPPWC Std. Plan 331-3, Construct Junction Structure, Case 3, Pipe to Pipe per SPPWC Std. Plan 332-2, Install Temporary Type 1A Traffic Signal Pole, Install Temporary 17-2-100, 20' Mast Arm, Traffic Signal Pole, Traffic Signal Improvements, Install Rectangular Rapid Flashing Beacon (RRFB), Install Signing, Striping and Markings, Install Signing, Striping and Markings on Six (6) Off-Alignment Bulb Outs, Install Decorative Crushed Stone, Boulders, and Irrigation Sleeves at Roundabouts, Install Landscaping and Irrigation, Construct 3" and 4" Curb Drains per City of Pomona Std. No. A-29-10, Construct 4' Parkway Drain per City of Pomona Std. No. A-30-10, Install Connector Pipe Screen (CPS) per Detail in Appendix K, Remove and Replace Sidewalk per City of Pomona Std. No. A-7-02 (Mid-Block Repair), Grind Sidewalk, 5% Maximum Slope, Grind Lip at Bottom of Curb Ramp, Patch Hole in Sidewalk, Remove and Replace Driveway per City of Pomona Std. No. A-27-10, Remove and Replace Curb and Gutter, Remove and Replace Alley Intersection Per City of Pomona Std. Plan No. A-5-06, Remove and Replace Curb Ramp, Install Glue-Down Detectable Warning Surface, Adjust Water Meter Box to Finished Surface, Replace Water Meter Box, Adjust Pull Box to Finished Surface, Replace Pull Box, Remove and Replace AC Berm, Remove and Replace 4" AC Dwy, Traffic Signal Improvements, Remove AC and Subgrade to a Depth of 4" Below Proposed Finished Surface ,Construct 2" AC, B2-PG 64-10, Cold Mill AC, 2" with Crack Fill and Crack Seal, Construct 2" FRARHM, Adjust Valve to Finished Surface, Adjust Manhole to Finished Surface (Double Adjust), Cold Mill AC, 2" with Crack Fill and Crack Seal, Construct 2" FRARHM, Adjust Valve to Finished Surface, Adjust Manhole to Finished Surface (Double Adjust), Remove Sidewalk and Ramp, Remove Curb and Gutter, Remove AC and Subgrade to a Depth of 6" Below Proposed Finished Surface, Remove Cross Gutter, Adjust Valve to Finished Surface, Adjust Water Meter Box to Finished Surface, Construct 8" Curb and 24" Gutter per City of Pomona Std. No. A-3-64, Type B, Construct Sidewalk per City of Pomona Std. No. A-7-02, Construct ADA Curb Ramp per City of Pomona Std. No. A-28-10, Construct Street Cross Gutter per City of Pomona Std. No. A-4-74, Construct 6" Curb, Type A-2 per City of Pomona Std. No. A-3-64, Construct 4" AC, B2-PG 64-10, Construct 2" FRARHM, Relocate Wrought Iron Fence, Traffic Signal Improvements at Franklin Ave and Reservoir St., Install Temporary Type 1A Traffic Signal Pole, Install Temporary 17-2-100, 20' Mast Arm, Traffic Signal Pole, Equipment Rental, Trucking

Griffith Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.
Requirements: Griffith Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and Carpenters Unions. 100% performance and payment bonds required for the full amount of the subcontract price. Subcontractors must possess a current contractor’s license, insurance and worker’s compensation insurance coverage meeting Griffith’s requirements. A copy of the insurance requirements and agreements can be obtained by contacting the Estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies. Griffith Company intends to work cooperatively with all qualified firms seeking work on this project. Griffith Company is an Equal Opportunity Employer.

Griffith Company
CA Contractors License #88
12200 Bloomfield Avenue, Santa Fe Springs CA 90670
Phone 562-929-1128 Fax 562-864-8970

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 
What are we about? Contact us HOME