www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002

CE Focus - Focus Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date October 25, 2022 @ 2:00 p.m. through bid opening date


Papich Construction Company an Equal Opportunity Employer is requesting sub-bids from all qualified subcontractors and suppliers including certified DBE firms performing a commercially useful function for referenced project:

Agency: City of Atascadero / Project No. C2015B03 / Federal Aid Project No. BRLO-5423(029)
Project: Santa Lucia Bridge Replacement
General work description: Bridge Replacement on realignment with approximately 350 feet of roadway reconstruction with HMA over AB
Plans & Specs: City of Atascadero, Santa Lucia Bridge Replacement
Estimate: $4,500,000 - $5,200,000.
DBE Goal: 17%

Bids open November 17, 2022, 1:30 p.m.

Michele Marquez | Estimating Support Manager
Email: estimating@papichconstruction.com

Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Construction Staking, Lead Compliance Plan, Construction Area Signs, Traffic Control System, Type III Barricade, Temporary Pavement Marking (Tape), Temporary Railing (Type K), Prepare Storm Water Pollution Prevention Plan, Rain Event Action Plan, Storm Water Sampling And Analysis Day, Storm Water Annual Report, Temporary Silt Fence, Temporary Construction Entrance, Temporary Concrete Washout, Water Quality Sampling and Analysis, Water Quality Monitoring Report, Water Quality Annual Report, Temporary Creek Diversion Systems, Contractor-Supplied Biologist (LS), Temporary High-Visibility Fence, Clearing And Grubbing (LS), Roadway Excavation, Structure Excavation (Bridge), Structure Backfill (Bridge), Rolled Erosion Control Product (Blanket), Hydromulch, Fiber Rolls, Hydroseed Mix 1, Hydroseed Mix 2, Compost (CY) ,Class 2 Aggregate Base (CY), Hot Mix Asphalt (Type A), Place Hot Mix Asphalt Dike (Type E), Place Hot Mix Asphalt Dike (Type F), Place Hot Mix Asphalt (Misc. Area), Remove Base and Surfacing, Temporary Bridge, Temporary Shoring, 24" Cast-In-Drilled-Hole Concrete Piling, Prestressing Cast-In-Place Concrete, Structural Concrete, Bridge Footing Structural Concrete, Bridge, Structural Concrete, Bridge (Polymer Fiber), Minor Concrete (Minor Structure), Architectural Treatment, Joint Seal (MR 1 1/2"), Bar Reinforcing Steel (Bridge), Bridge Removal, Infiltration Trench, Bioretention Swale, 18" Plastic Pipe, 6" Perforated Plastic Pipe Underdrain, 12" Corrugated Steel Pipe Downdrain, 12" Entrance Taper, 12" Downdrain Slip Joint, Corrugated Steel Pipe Inlet, 18" Alternative Flared End Section, 18" Precast Concrete Pipe Inlet, Storm Drain Manhole, Remove Culvert (LF), Rock Slope Protection (1/4 T), Class V, Method B) (CY), Rock Slope Protection, (60 Lb, Class II, Method B) (CY), Rock Slope Protection Fabric (Class 8), Miscellaneous Iron And Steel, Manhole Frame And Cover, Potable Water And Appurtenances, Standard Street Monument, Raise Valve To Grade, Relocate Water Meter, Prepare And Stain Concrete, Relocate Mailbox, Fence (Type WM, Wood Post), Wood Fence, Remove Fence, Object Marker (Type P), Remove Marker, Remove Roadside Sign, Reset Roadside Sign, Relocate Roadside Sign, Transition Railing (Type WB-31), Alternative In-Line Terminal System, Crash Cushion (Type TRACC), Concrete Barrier (Type 85) (Mod), Thermoplastic Traffic Stripe, Thermoplastic Pavement Marking, Temporary Signal Systems, Hauling.

Requirements: At the time of the bid, all subcontractors must possess a valid and relevant California Contractors License, a valid DIR registration number, meet the project’s minimum insurance requirements, and be 100% bondable. All subcontractor, supplier, and trucking proposals must be in strict accordance with the project plans, specifications, and any addenda issued. In addition, all Supplier and Subcontractors will be required to execute Papich’s standard subcontract or purchase order agreement (available upon request). Waiver of Subrogation will be required. Papich is a signatory contractor and will require a one-time job agreement for any non-union Subcontractors. Submission of a proposal shall constitute subcontractor, supplier, or trucker acceptance of all terms as listed above. Any attempted deviation or revision to said terms shall not be recognized by Papich. Papich can offer DBE/DVBE/SB firms assistance with bidding this contract including but not limited to: reducing items of work into smaller scopes, providing reimbursement for payment/performance bond premiums, and providing assistance obtaining materials. All requests for assistance must be made prior to the project bid date. Additionally, DBE/DVBE/SB firms must possess a valid and current certification to be considered for this contract. Questions concerning above requirements should be directed to our office prior to submission of a proposal.

Heavy Civil | Oil & Gas | Power | Site Development | Transportation
398 Sunrise Terrace | Arroyo Grande, CA 93420
Phone: 805-473-3016 Fax: 805-481-5966

Published on October 25, 2022 @ 2:00 p.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 
What are we about? Contact us HOME