Advertisement date September 29, 2025 @ 10:46 a.m. through bid opening date

License No. 266222
4225 Garner Road Riverside, CA 92501
Phone: 951-682-8308 Fax: 951-682-5872

Riverside Construction Company, Inc. Is requesting quotations from all qualified DBE Sub-contractors & Material suppliers performing commercially useful functions for the following project:
Town of Apple Valley | Project No. 2023-05
Bear Valley Road Bridge over Mojave River Rehabilitation Project
Bids Due 10/22/25 at 10:00 AM
Bid docs available on our website at https://bids.rivconstruct.com/
22% DBE Goal

Lead Estimator: Bryan Lounsbury
Email: estimating@rivconstruct.com

DESCRIPTION OF WORK: The Project generally consists of relocation of County of San Bernardino Special Districts waterline, site grading for relocation of Southern California Edison tubular steel pole, rehabilitation of Bear Valley Road Bridge over the Mojave River, retaining wall construction, curb and gutter and sidewalk improvements, construction of Multi-Use Path, drainage improvements, and road rehabilitation.

Quotes for Services and Supplies requested for the following items for bid including, but not limited to:  Construction Staking, Resident Engineers Office, Progress Schedule (Critical Path Method), Construction Area Signs, Traffic Control System, Flashing Arrow Sign, Type III Barricade, Temporary Pavement Marking (Paint), Temporary Traffic Stripe (Paint), Channelizer (Surface Mounted), Portable Delineator, Portable Flashing Beacons (Ea), Temporary Railing (Type K), Temporary Crash Cushion, Prepare Storm Water Pollution Prevention Plan, Asbestos Compliance Plan, Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste), Contractor-Supplied Biologist, Remove Concrete (Sqyd), Temporary High-Visibility Fence, Roadway Excavation, Structure Excavation (Type D), Structure Excavation (Rock Slope Protection), Structure Excavation (Retaining Wall), Structure Backfill (Bridge), Structure Backfill (Retaining Wall), Imported Borrow, Ditch Excavation, Decomposed Granite, Hydroseed, Class 2 Aggregate Base, Micro-Surfacing, Hot Mix Asphalt (Type A), Place 6" Asphalt Concrete Dike, Place 8" Asphalt Concrete Dike, Remove Asphalt Concrete Dike, Cold Plane Asphalt Concrete Pavement, Remove Base And Surfacing, Remove Concrete Deck Surface, Temporary Decking, Temporary Shoring, 36" Cast-In-Drilled-Hole Concrete Piling, 72" Cast-In-Drilled-Hole Concrete Piling, Concrete Encasement, Prestressing Cast-In-Place Concrete, Structural Concrete, Bridge Footing, Structural Concrete, Bridge, Structural Concrete, Bridge (Polymer Fiber), Structural Concrete, Retaining Wall, Structural Concrete, Approach Slab, Structural Concrete, Headwall, Structural Concrete, Drainage Inlet, Concrete Surface Texture (Diagonal Fractured Rib), Concrete Surface Texture (8"X16" Split Face Block), Hydrodynamic Separator, Type "A" Catch Basin, Small Shallow Manhole, Small Manhole, Large Shallow Manhole, Large Manhole, Curb Inlet, Minor Concrete (Raised Median), Minor Concrete (Minor Structure), Drill And Bond Dowel, Furnish Precast Concrete Bat Roost, Erect Precast Concrete Bat Roost, Hinge Transverse Shear Key, Ptfe Spherical Bearing, Joint Seal, Bonded Joint Seal, Bonded Joint Seal, Bar Reinforcing Steel, Bar Reinforcing Steel (Bridge), Bar Reinforcing Steel (Retaining Wall), Bar Reinforcing Steel, Retaining Wall (Sound Wall), Remove Pedestrian Barricade, Sound Wall (Masonry Block), Inject Crack (Epoxy), Remove Asphalt Concrete Surfacing, Prepare Concrete Bridge Deck Surface, Furnish Polyester Concrete Overlay, Place Polyester Concrete Overlay, Remove Sound Wall (Lf), Bridge Removal, Bridge Removal (Concrete Pile), Infiltration Chamber System, 18" Reinforced Concrete Pipe, 48" Reinforced Concrete Pipe, 38"X60" Elliptical Reinforced Concrete Pipe, Welded Steel Pipe Casing (Bridge), Drainage Inlet Marker, Abandon Pipeline, Remove Pipe, Remove Inlet, Double Wing Curb Inlet, Rock Slope Protection (1T, Class VIII, Method A), Rock Slope Protection (300 Lb, Class Iv, Method B) (Cy), Rock Slope Protection (20 Lb, Class I, Method B), Rock Slope Protection Fabric (Class 8), Minor Concrete, Detectable Warning Surface, Minor Concrete (Curb And Gutter), Minor Concrete (Driveway), Minor Concrete (Sidewalk), Minor Concrete (Textured Paving), Minor Concrete (Curb Ramp), Remove Concrete Curb (Lf), Remove Concrete Sidewalk (Sqyd), Remove Concrete (Curb, Gutter, And Sidewalk), Remove Concrete (Curb And Gutter), Miscellaneous Iron And Steel, Protection Barrier No. 2, Miscellaneous Metal (Bridge), Bridge Deck Drainage System, Removable Pipe Bollard, 10" Ductile Iron Pipe, 12" Ductile Iron Pipe, Air And Vacuum Valve Assembly, Blow Off Assembly, Dewatering, Relocate Mailbox, Temporary Fence (Type Cl-6), Temporary Dust Control- Privacy Screen, Chain Link Fence (Type Cl-6), 16' Pipe Gate, 18' Chain Link Gate (Type Cl-6), Remove Fence, Remove Gate, Remove Pavement Marker, Remove Delineator, Pavement Marker (Retroreflective), Remove Roadside Sign (Metal Post), Remove Sign Post, Relocate Roadside Sign (Metal Post), Furnish Single Sheet Aluminum Sign (0.063" - Unframed), Roadside Sign - One Post, Install Sign (Mast-Arm Hanger Method), Steel Picket Railing, Cable Railing, Transition Railing (Type Agt), Alternative In-Line Terminal System, Alternative Crash Cushion, Remove Guardrail, Concrete Barrier (Type 836) (Modified), Thermoplastic Traffic Stripe, Thermoplastic Pavement Marking (Enhanced Wet Night Visibility), Remove Thermoplastic Traffic Stripe, Remove and Pavement Marking, Lighting System, Modifying Signal And Lighting Systems, Supplemental Work, Deck Repair, Mobilization

Riverside Construction Company, Inc is willing to break items of work into smaller increments to assist DBE Contractors and Suppliers in obtaining work on this project. Riverside Construction Company, Inc. is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. Riverside Construction Company, Inc. is interested in soliciting in Good Faith, including assistance in obtaining bonds, lines of credit, insurance, necessary equipment, materials and/or supplies. Subcontractors may be required to furnish performance and payment bonds in the full amount of their subcontract by an admitted surety and subject to approval by our estimating department. A Worker’s Compensation Waiver of Subrogation will be required. Conditions or exceptions in Subcontractor’s quote are expressly rejected unless accepted in writing. Subcontractor scope (including any conditions or exceptions) is required 24 hours prior to bid deadline to allow proper evaluation. Quotes are required to be in accordance with the plans and specifications and good for the contract duration as specified in the bid documents. In order to assist DBE contractors and suppliers, Riverside Construction Company will divide bid items into smaller tasks or quantities when feasible to facilitate maximum Participation.

Riverside Construction Company, Inc.
License No. 266222
4225 Garner Road Riverside, CA 92501
Phone: 951-682-8308 Fax: 951-682-5872

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 
What are we about? Contact us HOME