Powell Constructors, Inc., an Equal Opportunity Employer, is seeking quotes from all qualified subcontractors and suppliers including certified DBE firms performing a commercially useful function for the referenced project:
Agency: Town of Apple Valley
Project No. 2023-05
Project: Bear Valley Road Bridge Over Mojave River Transportation Improvement Project.
Location: Apple Valley, CA.
Estimate: $43,246,369.60
DBE: 22%
Bid Due Date: Oct 22, 2025, at 10:00 AM
ALL BID ITEMS ARE OPEN FOR BID, including items of work normally performed by Powell Constructors, Inc.
Construction Area Signs, Traffic Control, Temporary Railing (Type K), Temporary Crash Cushion, SWPPP Planning, Asbestos Compliance Plan, Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste), Contractor-Supplied Biologist, Remove Concrete , Temporary Fence, Roadway Excavation, Structure Excavation, Structure Backfill, Imported Borrow, Ditch Excavation, Decomposed Granite, Hydroseed, Aggregate Base, Micro-Surfacing, Hot Mix Asphalt, Asphalt Concrete Dike, Remove Asphalt Concrete Dike, Cold Plane Asphalt Concrete Pavement, Remove Base And Surfacing, Remove Concrete Deck Surface, Temporary Decking, Temporary Shoring, C-I-D-H Concrete Piling, Prestressing Cast-In-Place Concrete, Structural Concrete, Concrete Surface Texture , Hydrodynamic Separator, Catch Basin, Manhole, Curb Inlet, Minor Concrete, Drill & Bond Dowel, Furnish/Erect Precast Concrete Bat Roost, Hinge Transverse Shear Key, Ptfe Spherical Bearing, Joint Seal , Bar Reinforcing Steel, Remove Pedestrian Barricade, Sound Wall (Masonry Block), Inject Crack, Remove Asphalt Concrete Surfacing, Prepare/Furnish Concrete Bridge Deck Surface, Place Polyester Concrete Overlay, Remove Sound Wall, Bridge Removal, Infiltration Chamber System, Reinforced Concrete Pipe, Welded Steel Pipe Casing (Bridge), Drainage Inlet Marker, Abandon Pipeline, Remove Pipe/Inlet, Double Wing Curb Inlet, Rock Slope Protection, Minor Concrete, Remove Concrete Curb, Misc Iron And Steel, Bridge Deck Drainage System, Removable Pipe Bollard, Ductile Iron Pipe, Air And Vacuum Valve Assembly, Blow Off Assembly, Dewatering, Relocate Mailbox, Fencing & Gate, Remove Fence & Gate, Remove Pavement Marker/Delineator, Pavement Marker, Remove Roadside Sign, Roadside Signs, Railing, Remove Guardrail, Concrete Barrier, Thermoplastic Traffic Stripe & Marking, Remove Thermoplastic Traffic Stripe & Marking, Electrical, Supplemental Work, Deck Repair, & Trucking.
Quotations will be broken down into comparable packages as reasonably necessary. Powell Constructors, Inc. will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.Requirements: Union Signatory, 100% Payment and Performance Bonds from an accepted surety may be required. Powell Constructors, Inc. will reimburse the subcontractor for bond premium up to 2%. Assistance in bonding, insurance, lines of credit or obtaining equipment, supplies, materials, or related assistance or services is available upon request. Subcontractors must possess a current contractor's license and provide General Liability, Auto and Worker's Compensation Insurance meeting the minimum requirements per the specifications. Subcontractors must also be registered with the Department of Industrial Relations (DIR) pursuant to the Labor Code section 1725.5. Powell Constructors, Inc. is an Equal Opportunity Employer and greatly encourages DBE participation.
Plans and Specifications are available for review at the following locations:
Dropbox Website:
https://www.dropbox.com/scl/fo/8wo1nutpw7kitrxas03w5/AGM_UnSx10LHYUbQ14rHmMU?rlkey=jgsex2a6dwpsggjnoydejx1zs&st=848brslf&dl=0
Powell Constructors, Inc.
8555 Banana Ave.
Fontana, CA 92335
Phone (909) 356-8880
Fax (909) 356-1299
For More information or questions, please contact our estimator
Estimator: Joe Schulte
Email Quotes: Estimate@powellconstructors.com |