www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002

CE Focus - Focus Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date September 25th, 2023 @ 4:30 p.m. through bid opening date


Papich Construction Company Is requesting quotations from all qualified DBE Sub-contractors and Material suppliers for the following project:

Agency: County of San Luis Obispo
Project: State Highway and County Road in SLO, Avila Beach Drive Separation Formal Bid #300506
Bid docs available on the County website at:
https://www.slocounty.ca.gov/Departments/Central-Services/Purchasing-Services/Services/Bid-RFP-Opportunities.aspx

Bids open October 19, 2023, at 3:00 PM
Bids open November 2, 2023, at 3:00 PM

DBE Goal: 22%

General work description: This project will improve the operations and multi-modal access of Avila Beach Drive at the northbound and southbound intersections. The project will consist of three main components: 1) A roundabout at the southbound ramp intersection; 2) Modifications to the northbound off-ramp; and 3) A Park & Ride lot and Regional Transit Authority (RTA) bus stop at the southwest corner of Avila Beach Drive and Shell Beach Road.

Estimating Dept.
Email: estimating@papichconstruction.com

Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Lead Compliance Plan, Level 2 Critical Path Method Schedule, Develop Water Supply, Construction Area Signs, Traffic Control System, Traffic Control Supervisor, Additional Flaggers (Allowance), Type Iii Barricade (10’), Temporary Pavement Marking (Paint), Temporary Traffic Stripe (Paint), Channelizer (Surface Mounted), Portable Radar Speed Feedback Sign System Day, Portable Changeable Message Sign, Temporary Barrier System, Alternative Temporary Crash Cushion, Temporary Radar Speed Feedback Sign System, Prepare Storm Water Pollution Prevention Plan, Rain Event Action Plan, Storm Water Sampling And Analysis Day, Storm Water Annual Report, Move-In/Move-Out (Temporary Erosion Control), Temporary Hydraulic Mulch (Bonded Fiber Matrix), Temporary Check Dam, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Large Sediment Barrier, Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Remove Yellow Painted, Traffic Stripe (Hazardous Waste), Treated Wood Waste, Temporary High- Visibility Fence, Clearing And Grubbing (Ls), Shoulder Backing, Structure Excavation (Soil Nail Wall), Structure Excavation (Ground Anchor Wall), Structure Backfill (Ground Anchor Wall), Structure Backfill (Soil Nail Wall), Porous Flexible Paving Grid System, Roadside Clearing, Rock Blanket, Soil Amendment (Organic), Slow-Release Fertilizer (Tablet), Soil Testing, Plant (Group A) (1-Gallon Container), Plant (Group B) (5-Gallon Container), Plant (Group U) (15-Gallon Container), Wood Mulch, Gravel Mulch, Plant Establishment Work (3 Years), Provide Irrigation Water, Root Barrier, Control And Neutral Conductors (Armor-Clad), 4 Station Irrigation Controller (Pedestal Mounted), ¾” Drip Irrigation Tubing, Drip Valve Assembly, Plastic Pipe, Check Valve, Air Release And Vacuum Relief Valves, 2.0 Gph Emitters, 4” Pvc Pipe Conduit (Sleeve), 8” Welded Steel Pipe Conduit, 2,500 Gallon Hdpe Water Tank Irrigation Pump – Self, Contained With Tank Float, Imported Topsoil, Bonded Fiber Matrix, Fiber Rolls, Compost, Incorporate Materials, Finishing Roadway, Class 2 Aggregate Base, Lean Concrete Base, Slurry Seal, Hot Mix Asphalt (Type A), Place Hot Mix Asphalt Dike, Place Hot Mix Asphalt (Miscellaneous Area), Cold Plane Asphalt Concrete Pavement, Ground Anchor (Subhorizontal), Soil Nail, Stormwater Control Structure, Urban Catch Basin, 2’X2’ Drainage Inlet, Detention Basin Outlet Structure, Type Go Drainage Inlet, Type G1 Drainage Inlet, Downdrain Inlet System, Storm Drain Manhole, Bar Reinforcing Steel (Retaining Wall), Sculpted Shotcrete, Structural Shotcrete, Hydrodynamic Separator,  Cleanout, 18" Slotted Corrugated Steel Pipe (.064" Thick), Class 1 Type B Permeable Material, 8" Corrugated Steel Pipe Downdrain System, Rural Catch Basin, Concrete Pipe Inlet (Ocp), Wall Drain System, Maintenance Drain System, Abandon Culvert, Remove Pipe, Remove Inlet, Remove Omp, Adjust Inlet, Adjust Omp, Small-Rock Slope Protection, Slope Paving, Rock Slope Protection Fabric, Minor Concrete (Curb Type R), Minor Concrete (Flush Curb), Minor Concrete (Flush Deepened Curb), Minor Concrete (Deepened Curb), Minor Concrete (Curb), Minor Concrete (Gutter), Minor Concrete (Cross Gutter), Detectable Warning Surface, Minor Concrete (Miscellaneous Construction), Minor Concrete (Curb And Gutter), Minor Concrete (Colored & Stamped), Minor Concrete (Sidewalk), Minor Concrete (Curb Ramp), Remove Concrete Island (Portions), Remove Concrete (Curb And Gutter), Reinforced Concrete Truck Apron (Integrally Colored Exposed Aggregate), Reinforced Concrete (Bus Pad), Lighting (Parking Lot), Remove And Replace Monument, Prepare And Stain Shotcrete, Construction Survey, Chain Link Fence (Type Cl-5), Remove Chain Link Fence, Remove Wood Bollard, Delineator (Class 1), Parking Stall Marker, Pavement Marker (Retroreflective), Object Marker, Remove Marker, Remove Roadside Sign, Relocate Roadside Sign, Furnish Single Sheet Aluminum Sign (0.063"- Unframed), Aluminum Sign (0.063"- Unframed), Furnish Single Sheet Aluminum Sign (0.080"-, Furnish Single Sheet Aluminum Sign (0.080"- Framed), Roadside Sign - One Post, Roadside Sign - Two Post, Install Sign (Strap And Saddle Bracket Method), Tubular Handrailing, Cable Railing (Modified), Concrete Barrier (Type 60Md, Integrally Colored), Remove Guardrail, Thermoplastic Traffic Stripe, Thermoplastic Pavement Marking, Preformed Thermoplastic Pavement Marking (Green), Remove Thermoplastic Traffic Stripe, Remove Thermoplastic Pavement Marking, Temporary Lighting Systems, Modifying Lighting Systems, Removing Traffic Monitoring Stations

Requirements: At the time of the bid, all subcontractors must possess a valid and relevant California Contractors License, a valid DIR registration number, meet the project’s minimum insurance requirements, and be 100% bondable. All subcontractor, supplier, and trucking proposals must be in strict accordance with the project plans, specifications, and any addenda issued. In addition, all Supplier and Subcontractors will be required to execute Papich’s standard subcontract or purchase order agreement (available upon request). Waiver of Subrogation will be required. Papich is a signatory contractor and will require a one-time job agreement for any non-union Subcontractors. Submission of a proposal shall constitute subcontractor, supplier, or trucker acceptance of all terms as listed above. Any attempted deviation or revision to said terms shall not be recognized by Papich. Papich can offer DBE/DVBE/SB firms assistance with bidding this contract including but not limited to: reducing items of work into smaller scopes, providing reimbursement for payment/performance bond premiums, and providing assistance obtaining materials. All requests for assistance must be made prior to the project bid date. Additionally, DBE/DVBE/SB firms must possess a valid and current certification to be considered for this contract. Questions concerning above requirements should be directed to our office prior to submission of a proposal.

Heavy Civil | Oil & Gas | Power | Site Development | Transportation
398 Sunrise Terrace | Arroyo Grande, CA 93420
Phone: 805-473-3016 Fax: 805-481-5966

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 
What are we about? Contact us HOME