Riverside Construction Company, Inc. Is requesting quotations from all qualified DBE Sub-contractors & Material suppliers performing commercially useful functions for the following project:
Agency: Caltrans 08-1M5604
Construction on State Highway in San Bernardino County in San Bernardino at Waterman Ave Eastbound Exit Ramp (08-1M5604)
Bids Due 11/5/25 at 2:00 PM
Bid docs available on our website at bids.rivconstruct.com or https://ppmoe.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php
22% DBE Goal
Lead Estimator: Bryan Lounsbury
Email: estimating@rivconstruct.com
Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Lead Compliance Plan, Time-Related Overhead (Wday), Dispute Resolution Advisor On-Site Meeting, Hourly Off-Site Dispute-Resolution- Advisor-Related Tasks, Construction Area Signs, Traffic Control System, Stationary Impact Attenuator Vehicle, Temporary Pavement Marking (Paint), Temporary Traffic Stripe (Paint), Channelizer (Surface Mounted), Portable Radar Speed Feedback Sign System, Temporary Pavement Marker, Temporary Barrier System, Temporary Pedestrian Access Route, Portable Changeable Message Sign (Ea), Temporary Crash Cushion Tl-3, Temporary Radar Speed Feedback Sign System, Job Site Management, Stormwater Pollution Prevention Plan, Stormwater Annual Report, Temporary Soil Binder, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Construction Entrance, Temporary Concrete Washout, Treated Wood Waste, Contractor-Supplied Biologist (Ls), Noise Monitoring, Temporary High-Visibility Fence, Clearing And Grubbing (Ls), Roadway Excavation, (F) - Structure Excavation (Retaining Wall), (F) - Structure Backfill (Retaining Wall), (F) - Pervious Backfill Material (Retaining Wall), Embankment, Roadside Clearing, Rock Blanket, Soil Amendment, Slow-Release Fertilizer, Plant (Group F), Plant (Group U), Plant Establishment Work, Wood Mulch, Check And Test Existing Irrigation Facilities, Operate Existing Irrigation Facilities, Remove Irrigation Facility, Control And Neutral Conductors (Armor-Clad), 1 1/2" Remote Control Valve, 2" Remote Control Valve, Tree Well Sprinkler Assembly, Pop-Up Sprinkler Assembly (Gear Driven), 3" Gate Valve, (F) - 3/4" Plastic Pipe (Schedule 40) (Supply Line), (F) - 1" Plastic Pipe (Schedule 40) (Supply Line), (F) - 1 1/2" Plastic Pipe (Schedule 40) (Supply Line), (F) - 2" Plastic Pipe (Schedule 40) (Supply Line), (F) - 3" Plastic Pipe (Schedule 40) (Supply Line), Class 2 Aggregate Base (Cy), Lean Concrete Base Rapid Setting, Base Bond Breaker, Prime Coat, Hot Mix Asphalt (Type A), Rubberized Hot Mix Asphalt (Gap Graded), Place Hot Mix Asphalt Dike (Type A), Place Hot Mix Asphalt Dike (Type C), Place Hot Mix Asphalt Dike (Type D), Place Hot Mix Asphalt (Miscellaneous Area), Tack Coat, Remove Asphalt Concrete Dike, Jointed Plain Concrete Pavement (Rsc), Isolation Joint Seal (Silicone), (F) - Structural Concrete, Retaining Wall, Concrete Surface Texture (Fractured Rib), (F) - Bar Reinforcing Steel (Retaining Wall), Grated Line Drain, Modify Inlet, Detectable Warning Surface, Minor Concrete (Curb And Gutter), Minor Concrete (Curb, Sidewalk And Curb Ramp), Remove Concrete (Curb And Gutter), Remove Concrete (Curb, Gutter, And Sidewalk) (Cy), Chain Link Fence (Type Cl-6), Remove Chain Link Fence, Remove Pavement Marker, Guard Railing Delineator, Pavement Marker (Retroreflective), Remove Roadside Sign (Wood Post), Remove Roadside Sign Panel, Reset Roadside Sign, Furnish Single Sheet Aluminum Sign (0.080"-Unframed), Roadside Sign - One Post, Install Sign (Strap And Saddle Bracket Method), Midwest Guardrail System (Steel Post), (F) - Chain Link Railing (Type 7), End Anchor Assembly (Type Sft-M), Alternative In-Line Terminal Tl-3, Severe-Duty Crash Cushion Tl-3, (F) - Concrete Barrier (Type 836A), (F) - Concrete Barrier (Type 836B), Thermoplastic Pavement Marking (Enhanced Wet Night Visibility), Paint Traffic Stripe (1-Coat), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 12" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Remove Pavement Marking, Remove 6" Traffic Stripe, Maintaining Existing Traffic Management System Elements During Construction, Modifying Fiber Optic Cable Systems, Modifying Lighting Systems, Modifying Signal And Lighting Systems, Mobilization
Riverside Construction Company, Inc is willing to break items of work into smaller increments to assist DBE Contractors and Suppliers in obtaining work on this project. Riverside Construction Company, Inc. is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. Riverside Construction Company, Inc. is interested in soliciting in Good Faith, including assistance in obtaining bonds, lines of credit, insurance, necessary equipment, materials and/or supplies. Subcontractors may be required to furnish performance and payment bonds in the full amount of their subcontract by an admitted surety and subject to approval by our estimating department. A Worker’s Compensation Waiver of Subrogation will be required. Conditions or exceptions in Subcontractor’s quote are expressly rejected unless accepted in writing. Subcontractor scope (including any conditions or exceptions) is required 24 hours prior to bid deadline to allow proper evaluation. Quotes are required to be in accordance with the plans and specifications and good for the contract duration as specified in the bid documents. In order to assist DBE contractors and suppliers, Riverside Construction Company will divide bid items into smaller tasks or quantities when feasible to facilitate maximum Participation.