Caliba Inc. is seeking qualified DVBE subcontractors, suppliers for the Re-Bid San Bernardino High School – Bldg. M “Maker Space” Project
Please see the NIB or Specification section for the subcontractor’s prequalification requirements.
The Scope of the work includes but is not limited to the demolition of three existing buildings including underground utilities, site preparation and grading including installation of new underground utilities, construction of three new structures of type VB construction, construction of various site work including fencing, water retention basins, courtyards, plantings, and an exterior non-combustible canopy system. Replacement of all existing fire alarm control panels at the admin building to comply with the DSA for the new buildings.
Caliba Inc. an Equal Opportunity Employer requests sub quotes from all qualified subcontractors and suppliers including certified DVBE firms performing commercially useful function for the following items of work, including but not limited to: Structural Steel & Misc. Metal, Fire protection, Low Voltage, Underground Utilities, Site Preparation, Grading, Fencing, Landscaping, Fire Alarm upgrades, Electrical, Minor Concrete, Mechanical & Demolition.
Caliba Inc. requires 100% Performance & Payment Bonds. If requested, and as Caliba Inc. way of assisting subs in obtaining bonds, lines of credit and insurance in the preparation of this project, we can initiate introduction to agents known to us. Caliba Inc. can also assist in obtaining equipment, supplies, materials or related assistance or services in the preparation of this project. Caliba Inc. is relying on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope found in the plans, specifications and addenda regardless of any qualifying language in the proposal. Caliba Inc.'s listing of a subcontractor is not an acceptance of any or all of that subcontractor's conditions, qualifications, exclusions or exceptions included in the subcontractor's bid proposal. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor's bid must remain valid with the owner, as specified in the project's specifications.
Each listed subcontractor must execute Caliba Inc. standard subcontract agreement if Caliba Inc. is awarded the project; the standard subcontract is available for review at Caliba Inc.’s office. At the discretion of Caliba Inc., any listed subcontractor that withdraws its bid after Caliba Inc. submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor.
This is a prevailing wage project. If this project is subject to a Project Labor Agreement or Project Stabilization Agreement, you will be required to honor the terms of such agreement.
Caliba Inc.
8031 Main Street, Stanton, CA 90680
An Equal Opportunity Employer
|