www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002

CE Focus - Focus Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date September 8th, 2023 @ 9:10 a.m. through bid opening date

License No. 266222
4225 Garner Road Riverside, CA 92501
Phone: 951-682-8308 Fax: 951-682-5872

Riverside Construction Company, Inc. an Equal Opportunity Employer is requesting sub-bids from all qualified subcontractors and suppliers including certified DBE firms performing a commercially useful function for referenced project:

Owner: City of Fontana | BID NO. SB-109-DE-23
Project: San Sevaine Trail - Phase 1, Segment 2
BID DATE: Thursday, September 28, 2023, at 2:00 PM
BID DATE: Thursday, October 5, 2023 at 2:00 pm

NEW BID DATE: Monday, October 9, 2023 at 2:00 pm
Project Location: This project is located in both the City of Fontana and the City of Rancho Cucamonga.

**Addendums 1-6 issued**

22% DBE Goal

Lead Estimator: Bryan Lounsbury
Email: estimating@rivconstruct.com

Bid documents are available on Riverside Construction's plan room website at:  bids.rivconstruct.com

The following items of work are requested, including but not limited to: Mobilization And Demobilization, Clearing And Grubbing (Removals), Prepare And Implement Best Management Practice, Swppp, And Npdes Requirements Per Contract, Project Notification Signage, Caltrans Construction Permitting, Relocate 4" Blow Off Assembly Per Cvwd Std Plan 119, Install Drinking Fountain Drainage Sump Assembly, Install Drinking Fountain 1.5" Water Service At Banyan, Grading/Unclassified Excavation/Unclassified Fill/Hauling Per Grading Plan, Construct 6" Crushed Base Per Spec Section 200, Apply Asphalt Edge Sealer To Joint At Trail/Wall Interface, Install Type 1 Emulsion Aggregate Slurry Seal, Cold Plane Ac Pavement 0.17' Per Sppwc Section 39-3, Construct 0.17' HMA Type A Overlay, Construct 0.50' HMA Type A Overlay, Construct 3.5" Ac Over Compacted Native Material, Construct 8" Ac Berm Per Caltrans Std Plan A87B, Type A, Modified To 8" Dike Height, Construct Concrete Pipe Headwall, Construct Removable 4" Metal Bollard, Construct 4" Metal Bollard, Construct 8" Thick Concrete Slope Paving, Construct 8" PCC Curb And Gutter Per City Of Fontana Std Plan 1000, Construct Concrete Header Per City Of Rancho Cucamonga Std Plan 534, Construct 12" To 18" PCC Curb, Per Detail H Cd-05, Construct 4" PCC Sidewalk Per City Of Fontana Std Plan 1006, Construct 8" PCC Pavement Per City Of Rancho Cucamonga Std Plan 101, Construct 6' High Chain Link Fence Per Sbc Road Dept Std Plan 300, Construct 20' Wide Double Drive Gate Per Sbcfcd Special Dwg No. 1, Construct 4' Wide Chain Link Walk Gate Per Sppwc Std Plan 103, Construct Cable Railing Per Caltrans Std Plan B11-47, Construct Metal Handrail With 18" Embedment, Construct Midwest Guardrail System Type 12B, Per Caltrans Std Plan A77Q1, Including Flared End Treatment, Construct Midwest Guardrail System Type 12A, Per Caltrans Std Plan A77Q1, Including In-Line End Treatment, Construct 24' Wide Powered Double Drive Gate And Controls At Rv Storage Facility Crossing, Install Solar Lighted Light Fixtures With Single Fixture, Includes But Not Limited To Pole Foundation And Installation., Install Solar Lighted Light Fixtures With Double Fixture, Includes But Not, Limited To Pole Foundation And Installation., Install Under Bridge Lighting At I-15 Frwy, Includes But Not Limited To Installation, Conduit, And Wiring., Install Under Bridge Lighting At Sr- 210 Frwy, Includes But Not Limited To Installation, Conduit, And Wiring., Construct Curb Ramp Per City Of Fontana Std Plan 1003, Construct PCC Driveway Approach Per City Of Fontana Std Plan 1001, Construct Commercial Driveway Approach Per City Of Fontana Std Plan 1001, Construct Curb Opening Inlet With Manhole In Street And 14' Catch Basin Per Sppwc Std Plan 307-3, Construct Curb Opening Inlet With Manhole In Street And 21' Catch Basin Per Sppwc Std Plan 307-3, Adjust Manhole Frame And Cover To Grade Per City Of Fontana Std Plan 2000, Reconstruct Concrete Manhole Apron Per Plan Cd-08, Remove Existing Metal Drainage Grate And Install Bicycle Proof Type 24-13 Drainage Grate Per Caltrans Std Plan D77B, Construct Stormwater Infiltration Section Per Plan Cd-07 Detail V, Construct Rip Rap Slope Protection Per Detail F Cd-05, Install 24" RCP 2000D, Includes Excavation And Backfill Per City Of Fontana Std Plan 1008, Install 18" RCP 2000D, Includes Excavation And Backfill Per City Of Fontana Std Plan 1008, Install 18" RCP 2000D Drain Pipe, Includes Excavation And Backfill, Per Detail M&N Cd-06, Construct Retaining Wall R1A: Soldier Pile Wall At I-15, Construct Retaining Wall R1B: Diaphragm Tieback Wall At I-15, Construct Retaining Wall R1C: Soldier Pile Wall At I-15, Construct Retaining Wall R2: Cip L Shape Wall At I-15, Construct Retaining Wall R6A Soldier Pile Wall At Sr-210, Construct Retaining Wall R6B Cip L Shape Wall At Sr-210, Construct Retaining Wall R7A: Soldier Pile Wall At Sr-210, Construct Retaining Wall R7B: Diaphragm Tieback Wall At Sr-210, Construct Retaining Wall R8: Soldier Pile Wall At Sr-210, Construct 6' Masonry Retaining Wall Per Caltrans Std Plan B3-7A Type 6A, Develop And Implement Temporary Traffic Control At Banyan Street (Including Complete Traffic Control Plans), Develop And Implement Temporary Traffic Control At Victoria Street, (Including Complete Traffic Control Plans), Traffic Signal Installation At Victoria Street, Signing, Striping, And Pavement Markings At Victoria Street, Signing, Striping, And Pavement Markings Along Bike Trail, Landscape & Irrigation Improvements At Pacific Electric Trail, Including 90- Day Maintenance, Landscape & Irrigation Improvements At Banyan Street, Including 90-Day Maintenance, Construct Reinforced Concrete Curb Per Cd-11, Construct CMU Retaining Wall Per Detail 618-3 On Cd-09, Construct Cip Retaining Wall Per Detail 615-4 On Cd-10

Requirements: Riverside Construction Company, Inc. will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Requirements: Riverside Construction Company, Inc. is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and Carpenters Unions. 100% performance and payment bonds required for the full amount of the subcontract price. Subcontractors must possess a current contractor’s license, insurance and worker’s compensation insurance coverage meeting Riverside Construction Company, Inc. requirements. A copy of the insurance requirements and agreements can be obtained by contacting the Estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies. Riverside Construction Company, Inc. intends to work cooperatively with all qualified firms seeking work on this project. Riverside Construction Company, Inc. is an Equal Opportunity Employer.

Riverside Construction Company, Inc.
License No. 266222
4225 Garner Road Riverside, CA 92501
Phone: 951-682-8308 Fax: 951-682-5872

Estimator Bryan Lounsbury Email: estimating@rivconstruct.com

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 
What are we about? Contact us HOME