www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002

CE Focus - Focus Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date August 3, 2023 @ 11:00 a.m. through bid opening date

An Equal Opportunity Employer
Is requesting quotations from all qualified DBE Businesses performing commercially useful functions for the following project:

Project: REBID - Pure Water Monterey Groundwater Replenishment Project – Injection Well Facilities, Phase 4
Agency: Monterey One Water
Bid Date: Thursday, September 7, 2023, at 2:00 PM
Plans and Specs are available at the following link:
23-055 - REBID Pure Water Monterey-Injection Wells Ph. 4 - Monterey One Water

Summary of Work:  The Project work covered by the Injection Wells Expansion Project includes equipment procurement, installation, construction, well-drilling, testing and startup of two new deep purified water injection wells and ancillary systems which include vertical turbine backwash pumps and motors; Variable Frequency Drives (VFDs); Horizontal Direction Drilled (HDD) pipeline; percolation basin; associated electrical, instrumentation and control equipment; a full SCADA system and radio telemetry; and new electrical utility service. Project work will take place on the Former Fort Ord.

Specialty Construction is requesting quotes from all qualified subcontractors and suppliers including certified DBE Businesses firms for the following items of work, including but not limited to: Worker Protection and Safety/Shoring, 24-inch Diameter Type 316 Stainless Steel Well Casing Material, 24-inch Diameter Type 316 Wire- Wrapped Stainless Steel Well Screen Material, 24-inch Type 304 Stainless Steel Well Casing Material, 36-inch Diameter Mild Steel Conductor Casing Material, 4-inch Diameter Schedule 80 PVC Casing Material, Neutralization, All electrical & instrumentation work, All site & mechanical work at the Percolation Basin, All site & mechanical work at Well Site No. 6 & 7, Artificial Filter Feed Pipe Installation and Materials, Artificial Filter Pack Materials, Bailing Following Chemical Treatment and Isolation Swab/Airlifting, Bailing Following Swabbing, Chemical Treatment, Chlorine Flushing, Conductor Sealing Materials, Constant Rate Pumping Test, Conveyance Pipeline - Horizontal Directional Drilling (HDD), Conveyance Pipelines & Site Work, Disposal of Drilling Fluids, Drilling 12.25-inch Diameter Borehole, Drilling 17.5-inch Diameter Pilot Borehole below Conductor Casing, Drilling and Installation of 36-inch Diameter Permanent Conductor Casing, Dry-Swab with Single-Line Swab Tool, Geophysical Logging of Borehole, Geophysical Logging of Pilot Borehole, Grading Permits, Hauling and Offsite Disposal of Drilling Fluids, Installation and Materials for Sounding Tube and Screen/Casing Centralizers, Installation and Removal of Pumping Equipment for Development, Installation and Removal of Pumping Equipment for Short Duration Pumping Test, Installation of 24-inch Diameter Type 304 Stainless Steel Well Casing, Installation of 24-inch Diameter Type 316 Stainless Steel Wire-Wrapped Stainless Steel Well Screen, Blank Casing, and End Fitting, Installation of 4-inch Diameter Schedule 80 PVC Slotted Well Screen, blank, and end fitting, Installation of 4-inch Diameter Schedule 80 PVC Well Casing, Installation of Artificial Filter Pack, Installation of Conductor Sealing Materials, Installation of Well Sealing Materials, landscaping work, Locking Well Cap, 12" Stovepipe with Locking Lid, and Four Bollards, Mobilization and Demobilization,  Noise Mitigation (assume 12-foot high sound walls), Nylon Brushing, Percolation Basin Rehabilitation, Plumbness and Alignment Testing, Post- Commissioning Video Survey, Post-Chemical Simultaneous Air-Lift Pumping/Swabbing, Post-Commissioning Video Survey, Post-Physical Commissioning Short Duration Pumping Test, Pre- Commissioning Video Survey, Pre-Chemical Simultaneous Air-Lift Pumping/Swabbing, Pre-Commissioning Video Survey, Reaming 34-inch Diameter Well Borehole below Conductor Casing, Re-Install Permanent Pump Assembly, Remove Permanent Pump Assembly, Spinner Log of DIW-6 during Constant Rate Pumping Test, SWPPP and Traffic Control, Temporary Discharge, Storage, Conveyance, and Disposal, Variable Rate Pumping Test, Video Log Survey, Well Destruction, Well Destruction - In the event of unsuccessful borehole or failed well, Well Development by Overpumping, Well Development by Pumping, Well Development by Surging and/or Airlifting, Well Disinfection, Well Sealing Materials & Worker Protection and Safety/Shoring

Specialty Construction is willing to break down quotes into comparable packages as reasonably necessary. SCI will work with interested DBE firms to identify opportunities to break down items into economically feasible packages. Subcontractor/Supplier Requirements: In most cases subcontracts in excess of $50,000 may require 100% performance and payment bonds for the full amount of subcontract price.  SCI will pay for bond premiums up to 2%. Subcontractors must be registered with the Department of Industrial Regulations (DIR), possess a current contractor’s license, insurance and worker’s compensation coverage meeting SCI and Owner’s requirements. Subcontractors will also be required to sign the standard SCI Subcontract Agreement or Purchase Order as appropriate.  For copies of the insurance requirements, Subcontract Agreement or Purchase Order, please contact Sheri Shamblin. Include with your bid the Time required for Performance of your work and any Delivery Schedules so that we can establish a Flexible Timeframe for your work, however, contract time availability is dictated by the Contract Documents.

Specialty Construction, Inc.     
License No. 619361
645 Clarion Ct., San Luis Obispo, CA 93401
Phone: 805-543-1706 Fax: 805-543-1722

Sheri Shamblin sshamblin@specialtyconstruction.com

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.
 
NEWS
&
EVENTS

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 
What are we about? Contact us HOME