www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002

CE Focus - Focus Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date July 21, 2023 @ 3:51 p.m. through bid opening date

GUY F. ATKINSON CONSTRUCTION, LLC

Requests Quotes from All Qualified & Certified DBE Subcontractors/Suppliers/Consultants
for:
Caltrans Contract 05-3307C4
SLO 46 – Wye Segment

Construction on State Hwy 46 in San Luis Obispo County
at and near Cholame on Rte 41 from Rte 41/46 Separation to 0.8 Mile North of 41/46 Separation and on Rte 46 from 0.8 Mile West of Davis Rd to 0.5 Mile West of Antelope Rd

Bids Due Friday, August 4, 2023 (4:00 pm deadline)

Scopes of Work: 

BRIDGE JOINT SEAL  -  Joint Seal (MR 2”)
EARTHWORK  -  Structure Excavation (Bridge), Structure Excavation (Type D), Structure Excavation (Retaining Wall), Structure Backfill (Retaining Wall)

EROSION CONTROL -  Temporary Concrete Washout, Bird and Bat Exclusion Devices, Removable Bat Habitat

EROSION CONTROL MATERIALS  -  Temporary Concrete Washout, Bird and Bat Exclusion Devices, Removable Bat Habitat

FLATWORK  -  Minor Concrete (Exposed Aggregate Concrete), Minor Concrete (Bike Path)

FORMLINER  -  Concrete Surface Texture (Wooden Plank)

STREET SWEEPING  -  Street Sweeping
TRAFFIC CONTROL  -  Traffic Control System, Traffic Control Supervisor, Type III Barricade, Channelizer, Portable Radar Speed Feedback Sign System Day, Portable Changeable Message Sign, End of Queue Monitoring and Warning with Truck Mounted Changeable Message Sign Day, Temporary Radar Speed Feedback System

TRAFFIC CONTROL MATERIALS  -  Traffic Control System, Type III Barricade, Channelizer, Portable Radar Speed Feedback Sign System Day, Portable Changeable Message Sign, End of Queue Monitoring and Warning with Truck Mounted Changeable Message Sign Day, Temporary Radar Speed Feedback System

Estimated Construction Cost of this Segment is $140,000,000 

23% DBE Project Goal

*****Lower Tier DBE participation is greatly encouraged*****

Guy F. Atkinson Construction, LLC
18201 Von Karman Ave, 8th Floor, Irvine, CA  92612
Contractor License # 1004388
socal.estimating@atkn.com
Phone:  949-382-7145  /  Fax:  949-769-5600

Guy F. Atkinson is a union contractor and an Equal Opportunity Employer.  Atkinson is signatory to the Carpenters, Cement Masons, Laborers and Operating Engineers Unions. 100% Performance & Payment Bonds from an approved surety company will be required for subcontractors with contract value greater than $100,000.  Atkinson will pay the cost of bonds up to 2.0%.  Atkinson will assist in obtaining necessary equipment, supplies, materials or related services.  We will split items of work (see project specs for full list of bid items) and provide assistance for bonding, LOC and insurance where needed.  Subcontractors will be expected to sign Atkinson's standard subcontract and to comply with our company's standard insurance requirements which include a waiver of subrogation.  Pricing must hold through the duration of this contract.  Please provide contractor's license number and Department of Industrial Relations (DIR) registration number with your quote. 

Atkinson requests that subs and vendors register and prequalify, or update, in our online system at https://www.atknextranet.com prior to bidding.

TO VIEW AND DOWNLOAD PLANS, SPECS, SUPPLEMENTAL PROJECT INFORMATION, PROJECT SCHEDULE:  Please go to the Atkinson Public Plan Room at

https://app.buildingconnected.com/public/57352fafdf83a80a00578625

Please contact Atkinson with any questions or for help with your bid.

The project consists of converting the existing conventional 2-lane highway to a 4-lane divided expressway along a 5-mile stretch of the SLO 46 Corridors. Construction will include 2 bridges, demolition, grading, roadway excavation, drainage improvements, bridge barrier, utility installation, traffic signage and striping, and erosion control.  

Project Timeline: Currently under construction until January 2026.

State Route 46 Corridor Improvement Project | Caltrans

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 
What are we about? Contact us HOME