GRIFFITH COMPANY
REQUESTING SUB-BIDS ON ALL TRADES
From Qualified DBE Subcontractors & Suppliers
For the following project:
COACHELLA VALLEY WATER DISTRICT
SPEC NO. 2022-22
FY 2020-2021 NON-POTABLE WATER (NPW) PIPELINE CONNECTION PROJECTS
ADDENDUM 1 ISSUED 08/25/2022
ADDENDUM 2 ISSUED 10/05/2022
ADDENDUM 3 ISSUED 10/20/2022
ADDENDUM 4 ISSUED 10/28/2022
ADDENDUM 5 ISSUED 11/04/2022
https://pbsystem.planetbids.com/portal/16339/bo/bo-search
SCOPE OF WORK: SWPPP, TRAFFIC CONTROL, , TRAFFIC LOOPS, EROSION CONTROL, TEMPORARY RAILING (TYPE K), CONSTRUCTION AREA SIGNS, FLASHING ARROW SIGN, CHANGEABLE MESSAGE SIGN, TEMPORARY CRASH CUSHION, CONSTRUCTION SCHEDULE, CRUSHED MISCELLANEOUS BASE, AC PAVEMENT, PCC PAVEMENT, CATCH BASIN, CURB, CONCRETE FLATWORK, STRUCTURAL CONCRETE, JACK & BORE, OPERATIONS, WATERLINE CONSTRUCTION, WATERLINE SUPPLIES, ROCK & SAND
BIDS: SEPTEMBER 8, 2022 AT 2:00 PM
BIDS DUE: SEPTEMBER 8, 2022 AT 2:00PM
BIDS: OCTOBER 13, 2022 AT 2:00 PM
BIDS DUE: OCTOBER 13, 2022 AT 2:00 PM
BIDS: OCTOBER 26, 2022 AT 2:00 PM
BIDS DUE: OCTOBER 26, 2022 AT 2:00 PM
BIDS: NOVEMBER 10, 2022, AT 2:00 PM
BIDS DUE: NOVEMBER 10, 2022, AT 2:00PM
Plans & Specs available for review from 7:00 AM – 5:00 PM
Monday through Friday at:
Griffith Company
(an Equal Opportunity Employer)
3050 E. Birch Street
Brea, CA 92821
Phone 714/984-5500 Fax 714/854-0228
Contact: JASON DENNIS, CHIEF ESTIMATOR
100% Bonding may be required for all subcontractors
Assistance available in obtaining Bonds, Lines of Credit,
Insurance, Necessary Equipment, supplies, materials & Technical Assistance.
GRIFFITH COMPANY INTENDS TO CONDUCT ITSELF IN “GOOD FAITH” WITH
DBE FIRMS REGARDING PARTICIPATION ON THIS PROJECT. |