www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002

CE Focus - Focus Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date May 18, 2022 @ 3:30 p.m. through bid opening date

CA Contractors License #88
12200 Bloomfield Ave. 
Santa Fe Springs, Ca. 90670

Agency: San Bernardino County Transportation Authority - (IFB) 22-1002780
Project: Construction of the North 1st Avenue Bridge over the BNSF Railroad
Location: Barstow, CA
13% DBE Requirement
Bid Date: June 15, 2022 at 2:00 PM
NEW Bid Date: July 6th, 2022 at 2:00 PM

Tristan Holtz, Estimator
Email: tholtz@griffithcompany.net

***Addendums 1-5 Have Been Issued***

General description of work: General description of work: This construction project is located on North 1st Ave. in the City of Barstow. The City of Barstow in cooperation with the Caltrans and the SBCTA, is proposing to replace the existing two‐lane North 1st Avenue bridge over the BNSF railyard with a new two‐lane bridge including 8-foot shoulders and an 8-foot sidewalk. The southern terminus of the project would be just south of White Street and the northern terminus would be at Riverside Drive. The existing bridge would be demolished and removed. The North 1st Avenue Bridge Replacement Project consists of, but is not limited to, the following components:Construction of new 7-span post-tensioned concrete box girder bridge on seat type abutments and deep foundations.• Removal of existing 29-span steel truss and steel / timber girder bridge across the BNSF railyard.• Removal of existing building foundations.• Construction of new 380-foot-long soil nail retaining wall.• Realignment of North 1st Avenue approach roadway and intersections. Associated work includes utility relocation, drainage improvements, lighting improvements, pavement construction, curb ramps, sidewalks, and improvements to Del Taco parking lot.

Scope of Work: LOCATING UNDERGROUND FACILITIES ON RAILROAD PROPERTY, RESIDENT ENGINEERS OFFICE, LEAD COMPLIANCE PLAN, PROGRESS SCHEDULE (CRITICAL PATH METHOD), DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TYPE III BARRICADE, TEMPORARY PAVEMENT MARKING (PAINT), TEMPORARY TRAFFIC STRIPE (PAINT), TEMPORARY PAVEMENT MARKER, TEMPORARY RAILING (TYPE K), TEMPORARY ABSORB 350 (CRASH CUSHION), RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL), TEMPORARY HYDRAULIC MULCH, TEMPORARY CHECK DAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT FACILITY (BIN), TREATED WOOD WASTE, REMOVE BASE AND SURFACING, REMOVE CONCRETE (MISCELLANEOUS), REMOVE CONCRETE (HEADWALL), TEMPORARY FENCE (TYPE ESA), CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, STRUCTURE EXCAVATION (BRIDGE), STRUCTURE EXCAVATION (SOIL NAIL WALL), STRUCTURE BACKFILL (BRIDGE), STRUCTURE BACKFILL (SOIL NAIL WALL), PERVIOUS BACKFILL MATERIAL, IMPORTED BORROW (CY), ROCK MULCH, DECOMPOSED GRANITE, 18" CORRUGATED HIGH DENSITY POLYETHYLENE PIPE CONDUIT, PERMANENT EROSION CONTROL ESTABLISHMENT WORK, CLASS 2 AGGREGATE BASE (CY), HOT MIX ASPHALT (TYPE A), RUBBERIZED HOT MIX ASPHALT (GAP GRADED), TACK COAT, COLD PLANE ASPHALT CONCRETE PAVEMENT, SOIL NAIL, 30" CAST-IN-DRILLED-HOLE CONCRETE PILING, 96" CAST-IN-DRILLED-HOLE CONCRETE PILING, PRESTRESSING CAST-IN-PLACE CONCRETE, STRUCTURAL CONCRETE, BRIDGE FOOTING, STRUCTURAL CONCRETE, BRIDGE, STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER), STRUCTURAL CONCRETE, SOIL NAIL WALL, STRUCTURAL CONCRETE, APPROACH SLAB, MINOR CONCRETE (CROSS GUTTER), MINOR CONCRETE (VALLEY GUTTER), STRUCTURAL CONCRETE (DRAINAGE STRUCTURE), CONCRETE SURFACE TEXTURE (SPLIT FACE BLOCK), CONCRETE SURFACE TEXTURE (FRACTURED FIN -ABUTMENT), CONCRETE SURFACE TEXTURE (FRACTURED FIN -WALL), CONCRETE SURFACE TEXTURE (BARRIER PATTERN 842 and 732SW), PTFE SPHERICAL BEARING, JOINT SEAL ASSEMBLY, BAR REINFORCING STEEL (BRIDGE), BAR REINFORCING STEEL (SOIL NAIL WALL), HEADED BAR REINFORCEMENT, STRUCTURAL SHOTCRETE, BRIDGE REMOVAL, DRYWELL, FILTER FABRIC, REINFORCED CONCRETE PIPE, CLASS 3 PERMEABLE MATERIAL (BLANKET), DRAINAGE INLET MARKER, CONCRETE FLARED END SECTION, DRAINAGE CHECK VALVE, 36" REINFORCED CONCRETE PIPE RISER, REMOVE PIPE, ROCK SLOPE PROTECTION, MINOR CONCRETE (CURB), MINOR CONCRETE (GUTTER) (LF), DETECTABLE WARNING SURFACE, MINOR CONCRETE (MISCELLANEOUS CONSTRUCTION), MINOR CONCRETE (CURB AND GUTTER), MINOR CONCRETE (DRIVEWAY), MINOR CONCRETE (SIDEWALK), MINOR CONCRETE (CURB RAMP), REMOVE CONCRETE CURB (LF), REMOVE CONCRETE SIDEWALK (SQYD), REMOVE CONCRETE (CURB AND GUTTER), MISCELLANEOUS IRON AND STEEL, ISOLATION CASING, MISCELLANEOUS METAL (BRIDGE), BRIDGE DECK DRAINAGE SYSTEM, PREPARE AND STAIN CONCRETE, ANTI-GRAFFITI COATING, CHAIN LINK FENCE (TYPE CL-6), 6' CHAIN LINK GATE (TYPE CL-6), REMOVE FENCE, REMOVE PAVEMENT MARKER, PAVEMENT MARKER (RETROREFLECTIVE), REMOVE SIGN, FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED), ROADSIDE SIGN - ONE POST, MIDWEST GUARDRAIL SYSTEM (WOOD POST), CHAIN LINK RAILING (TYPE 7 MODIFIED), CABLE RAILING, CABLE RAILING (SOIL NAIL WALL), END ANCHOR ASSEMBLY (TYPE SFT), ALTERNATIVE IN-LINE TERMINAL SYSTEM, CONCRETE BARRIER, REMOVE GUARDRAIL, THERMOPLASTIC TRAFFIC STRIPE, THERMOPLASTIC PAVEMENT MARKING, 12" THERMOPLASTIC TRAFFIC STRIPE, 4" PAINTED STALL LINES AND PAVEMENT MARKINGS, REMOVE PAINTED TRAFFIC STRIPE, LIGHTING SYSTEM, MOBILIZATION, SCENIC OVERLOOK, TEMPORARY AT-GRADE TRACK CROSSINGS, ARCHITECTURAL TREATMENT (RETAINING WALL TRAIN MURAL), TRUCKING.

Plans & Specs Link: https://www.dropbox.com/sh/0p6lbah7f7qwnko/AABIFmq26O_LxOiN_hlhR3Qza?dl=0

Griffith Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.

Requirements: Griffith Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and Carpenters Unions. 100% performance and payment bonds required for the full amount of the subcontract price. Subcontractors must possess a current contractor’s license, insurance and worker’s compensation insurance coverage meeting Griffith’s requirements. A copy of the insurance requirements and agreements can be obtained by contacting the Estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies. Griffith Company intends to work cooperatively with all qualified firms seeking work on this project. Griffith Company is an Equal Opportunity Employer.

Griffith Company 
12200 Bloomfield Ave. Santa Fe Springs, Ca. 90670 
Phone 562-929-1128 Fax 562-864-8970 

Published on May 18, 2022 @ 3:30 p.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 
What are we about? Contact us HOME