www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002

CE Focus - Focus Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date May 7, 2024 @ 11:00 a.m. through bid opening date

Griffith Company Requests Sub-bids from All Qualified & Certified DBE Subcontractors/Suppliers for:
Contracting Agency: City of Bakersfield | Invitation #P1K304
Project: Friant Kern Canal Multi-use Path – Re-Bid
Bid Date: May 23, 2024, at 11:00 AM
DBE Goal: 25%
Engineer's Estimate $13,600,000.00

Plans & Specs can be viewed for free online at: https://www.dropbox.com/scl/fo/fkuj8240x5t3zvrhxt91l/AGhyGP3BMGoo5hOJd_KneVQ?rlkey=fs48j45lhzpoj4jc6q7xbr1kg&st=a9nynzsg&dl=0

Description: The work to be performed consists, in general, of a 6-mile-long multiuse path from the Kern River Channel to 7th Standard Road. The trail would run in a north-south orientation. The trail would be 12-feet-wide and constructed of asphalt with 4-foot-wide dirt shoulders. A chain-linked fence would be installed on both sides of the trail where fencing does not exist. There will be three new multiuse path crossings (bridges) within the Friant Kern Canal right of way and a fourth over the Burlington Northern Santa Fe (BNSF) railroad right of way. The three path crossings consist of (1) a bridge crossing over the outfall of the Friant-Kern Canal located within the Kern River floodplain, (2) a golf cart path undercrossing adjacent to the Links at Riverlakes Golf Course, and (3) a bridge adjacent to Madison Grove Park spanning the Friant Kern Canal. A prefabricated pedestrian overcrossing steel structured bridge would be constructed over the BNSF railway. The trail would be used for alternative transportation and recreation; as well as serve as an interconnection to community parks, school, shopping centers, and the Kern River Parkway. The trail would increase pedestrian and bicyclist safety, promote active modes of transportation, and reduce traffic congestion.

Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Mobilization, Time-Related Overhead, Construction Surveys, Concrete Curb And Gutter Type B Cob Std St-1, Drive Approach Type B Cob Std St-4, Drive Approach Type C Cob Std St-4.1, Minor Concrete (Sidewalk), Minor Concrete (Curb Ramp), HMA Type A, Aggregate Base, Chain Link Fence And Gate , Concrete Mow Strip For Chain Link Fence And Gate, Thermoplastic Crosswalk And Pavement Marking (Continental Crosswalk), Road Sign - One Post, Furnish Single Sheet Aluminum Sign (0.063" - Unframed), Remove Roadside Sign, Install Sign (Strap And Saddle Bracket Method), Remove Roadside Sign Panel, Install Roadside Sign Panel On Existing Post, Thermoplastic Pavement Marking (Bike Person), Thermoplastic Pavement Marking (Bike Arrow), Thermoplastic Pavement Marking (Arrow Type Iv (R)), Soil Stabilization, Thermoplastic Traffic Stripe (1' Limit Line), Remove Shrub, Remove Tree And Root System, Remove Concrete (Curb And Gutter), Remove Concrete Sidewalk, Remove Concrete Driveway, Remove Concrete (Curb Ramp), Remove Asphalt Concrete Pavement, Remove Chain Link Fence And Gate, Remove Headwall, Remove Overside Drain, Remove Thermoplastic Pavement Marking, Traffic Stripe (Detail C-19), Adjust Pull box To Grade, 12" Reinforced Concrete Pipe, 18" Reinforced Concrete Pipe, 12" Concrete Flared End Section, 18" Concrete Flared End Section, 36" Reinforced Concrete Pipe, 36" Precast Concrete Inlet, Minor Concrete (Miscellaneous Construction), Rock Slope Protection (20 Lb., Class I, Method B) (Cy), Rock Slope Protection Fabric (Class 8), SWPPP, Place Hot Mix Asphalt (Miscellaneous Area - Overside Drain), Structural Concrete, Headwall, Relocate Sign, Adjust Vault To Grade, Roadway Excavation, Imported Borrow, Concrete Pipe Field Collar Cob Std D-19, Miscellaneous Iron And Steel, Detectable Warning Surface, Modifying Signal And Lighting Systems, Maintaining Existing Traffic Management System Elements During Construction, Reconstruct Metal Beam Guardrail System, Channelizer (Surface Mounted), Progress Schedule, Construction Area Signs, Clearing And Grubbing, Adjust Monument Cover To Grade, Tack Coat, Dust Control, Object Marker (Type Q), 30" Corrugated Metal Pipe (14 Ga), Minor Concrete (Curb), Miscellaneous Rebar Fabrication And Installation (Sidewalk On Bridge), Small-Rock Slope Protection, Traffic Control, Temporary Chain Link Fence, Temporary Swing Gate, Steel Truss Bridge, Steel Truss Ramps, Steel Truss Towers, Steel Footing, Steel Abutment, Pedestrian Fencing, Concrete Bridge Deck, Concrete Ramp Deck, Concrete Footing, Concrete Abutment, Chain Link Fence, Potholing For Six Utilities, Relocate Existing Utilities, Mobilization, Storm Water Pollution Prevention Plan, Dust Control, Embankment, Imported Borrow, Storm Drain System, Reinforced Concrete (Abutments) – Outfall, Reinforced Concrete (Arch Footings And Wing Walls), Reinforced Concrete (Abutments) – Madison Grove Park, Reinforced Concrete (Bridge Deck) - Outfall, Reinforced Concrete (Bridge Deck) – Madison Grove Park, Pedestrian Bridge - Outfall, Pedestrian Bridge- Madison Grove Park, Precast Arch System, Rock Slope Protection (Riprap), Aggregate Base, HMA Paving, Roadside Signs, Finishing Roadway

Requirements: Griffith Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Griffith Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and Carpenters Unions. 100% performance and payment bonds required for the full amount of the subcontract price. Subcontractors must possess a current contractor’s license, Department of Industrial Relations (DIR) registration number, insurance and worker’s compensation insurance coverage meeting Griffith’s requirements. A copy of the insurance requirements and agreements can be obtained by contacting the Estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies. Griffith Company intends to work cooperatively with all qualified firms seeking work on this project. Griffith Company is an Equal Opportunity Employer.

Griffith Company
CA Contractors License #88
1128 Carrier Parkway Avenue Bakersfield, CA 93308
Phone: 661-392-6640 Fax: 661-393-9525

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 
What are we about? Contact us HOME