www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002

CE Focus - Focus Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date April 21, 2021 @ 9:05 a.m. through bid opening date

CA Contractors License #88
12200 Bloomfield Ave.
Santa Fe Springs, Ca. 90670

Griffith Company an Equal Opportunity Employer is requesting sub-bids from all qualified subcontractors and suppliers including certified DBE firms performing a commercially useful function for referenced project:

Project: VNY Runway 16L-34R Reconstruction & Runway 16R-34L Slurry Seal Project
Agency: Los Angeles World Airports (LAWA)Project No. 42037
Bid Date: May 18, 2021 @ 2:00pm
New Bid Date: May 20, 2021 @ 2:00pm
DBE Goal: 15%

BIDS DUE: MAY 18, 2021 AT 1:30 PM

*** Addendums 1, 2, & 3 have been issued***

Digital Link Plans & Specs: https://www.dropbox.com/sh/56l8nikriq4n3tx/AAAet-ilryb9KUH-v58F17Qia?dl=0

SCOPE OF WORK: Sweeping, Flagging, Security, and Vehicle Escort Services, Survey Services, CPM Scheduling Services, Mobilization/Demobilization, Construction Barricades, Delineators, Signs and Construction Fencing, Temporary Air and Water Pollution, Soil Erosion and Siltation Control, "X" Taxiway Closure Markers, Remove Painted Pavement Markings, Remove Variable Depth Asphalt Pavement, Cold Mill Asphalt Pavement for Overlay, Clearing and Grubbing, Unclassified Excavation, Over-Excavation of Unsuitable Materials, Subgrade Preparation - Type B (Proof Roll), Subgrade Stabilization Geotextile, Aggregate Subbase Course (P-154), Aggregate Base Course (P-208), Asphalt Concrete (P-401) Surface Course, Asphalt Concrete (P-403) Base Course, Asphalt Crack Repair, P-608 Asphalt Seal Coat, PCC Spall Repair, PCC Joint Seal Repair, PCC Crack Seal, 18-inch RCP Class V Pipe, Drainage Inlet Structure, Drainage Outlet Structure, Hydroseeding, Clean and Refresh Existing Pavement Marking (1 Coat w/ Glass Beads), Temporary Pavement Marking - (1 Coat), Temporary Pavement Marking - (1 Coat w/ Glass Beads), Permanent Reflective Marking - (2 Coats w/ Glass Beads Top Coat), Permanent Non-Reflective Marking - (2 coats), Permanent Green Shoulder Marking - (1 Coat), Temporary Lighting and Circuiting, Removal of Electrical Items, New 1-Module LED Sign, Size 2 on New Foundation with Isolation Transformer and New L-867 Base Can, New 4-Module LED Sign, Size 2, on New Foundation with Isolation Transformer and New L-867 Base Can, New 4-Module LED Sign, Size 2, on Existing Foundation with Isolation Transformer and New L-867 Base Can, Reinstall Existing 1 or 2 Module LED Sign on New Foundation with Isolation Transformer and New L-867 Base Can, Blank Base Can Drain Cover on Existing Base Can, New Base Can Drain, Medium Intensity Elevated Runway Edge/Threshold/End Light (LED) with Isolation Transformer on L-867 Base Can in Proposed AC Pavement, Medium Intensity In-Pavement Runway Edge/Threshold/End Light (LED) with Isolation Transformer on L-868 Base Can in Proposed AC Pavement, High Intensity Elevated Runway Edge/Threshold/End Light (LED) with Isolation Transformer on Existing Base Can, High Intensity In-Pavement Runway Edge/Threshold/End Light (LED) with Isolation Transformer on Existing Base Can, Elevated Taxiway Edge Light (LED) with L-867 Base Can and Isolation Transformer in Proposed AC Pavement, Reinstallation of Existing Elevated Taxiway Edge Light and Transformer on L-867 Base Can Proposed/Existing AC Pavement, In-Pavement Taxiway Edge Light with L-868 Base Can and Isolation Transformer in Proposed AC Pavement, In-Pavement Bidirectional Taxiway Centerline Light (LED) with L-868 Base Can and Isolation Transformer in Proposed AC Pavement, Reinstallation of Existing In-Pavement Taxiway Centerline Light and Isolation Transformer on L-868 Base Can in Proposed AC pavement, Connect New Ductbank to Existing, L-824 Cable, 1/C #8 AWG, 5 kV, Type C in Duct or Conduit, Ground Wire 1/C # 6 AWG, Green Insulated Copper, Bare Counterpoise Wire Installed in Trench, Ground Rod and Testing Pit, 1-2” Schedule 40 PVC Concrete-Encased Ductbank, 4-3" Schedule 40 PVC Concrete-Encased Ductbank, Electrical Junction Structure (L-868-867), Maintenance Hole Elevation Adjustment, Trucking.

                 Griffith Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.

Requirements: Griffith Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and Carpenters Unions. 100% performance and payment bonds required for the full amount of the subcontract price. Subcontractors must possess a current contractor’s license, insurance and worker’s compensation insurance coverage meeting Griffith’s requirements. A copy of the insurance requirements and agreements can be obtained by contacting the Estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies. Griffith Company intends to work cooperatively with all qualified firms seeking work on this project. Griffith Company is an Equal Opportunity Employer.

Griffith Company
12200 Bloomfield Ave. Santa Fe Springs, Ca. 90670
Phone 562-929-1128 Fax 562-864-8970

Contact: Scott McLure, Estimator
Email: smclure@griffithcompany.net

Published on April 21, 2021 @ 9:05 a.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 
What are we about? Contact us HOME