
Powell Constructors, Inc., an Equal Opportunity Employer, is seeking quotes from all qualified subcontractors and suppliers including certified DBE firms performing a commercially useful function for the referenced project:
Agency: Caltrans
Project No. 07-348504 Project: Construct ADA curb ramps and modify signal and lighting system.
Location: Rte. 2 in Los Angeles County at various locations from Riverside Drive to Gould Mesa.
Estimate: $5,200, 000
DBE: 22%
Bid Due Date: May 14, 2025, at 2:00 PM
ALL BID ITEMS ARE OPEN FOR BID, including items of work normally performed by Powell Constructors, Inc.
Lead Compliance, Dispute Resolution, Construction Area Signs, Traffic Control, Temp Traffic Stripe, Temp Crash Cushion Tl-3, WPCP Planning, WPCP Materials, Remove Yellow Thermoplastic Traffic Stripe & Markings (Hazardous Waste), Treated Wood Waste, Remove Concrete, Clearing & Grubbing, Roadway Excavation, Rock Blanket, Aggregate Base, Lean Concrete Base, Base Bond Breaker, Prime Coat, Hot Mix Asphalt, Place HMA Dike, Place HMA (Miscellaneous Area), Remove Asphalt Concrete Pavement, JPCP, Grind Existing Concrete Pavement, Drill & Bond Dowel, Clean Expansion Joint, Joint Seal, Bridge Removal (Portion), Detectable Warning Surface,Minor Concrete (Curb, Gutter, Sidewalk), Pre/Post Construction Surveys, (F) – Miscellaneous Metal (Bridge), Remove Pavement Marker Pavement Marker (Retroreflective), Remove Roadside Sign, Furnish Sign Panels, Road Signs, Install Signs, Mgs (Wood Post), Guardrail, Concrete Barrier, Pavement Markings & Striping, Remove Thermoplastic Traffic Stripe & Markings, Electrical, & Trucking.
Quotations will be broken down into comparable packages as reasonably necessary. Powell Constructors, Inc. will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Requirements: Union Signatory, 100% Payment and Performance Bonds from an accepted surety may be required. Powell Constructors, Inc. will reimburse the subcontractor for bond premium up to 2%. Assistance in bonding, insurance, lines of credit or obtaining equipment, supplies, materials, or related assistance or services is available upon request. Subcontractors must possess a current contractor's license and provide General Liability, Auto and Worker's Compensation Insurance meeting the minimum requirements per the specifications. Subcontractors must also be registered with the Department of Industrial Relations (DIR) pursuant to the Labor Code section 1725.5. Powell Constructors, Inc. is an Equal Opportunity Employer and greatly encourages DBE participation.
Plans and Specifications are available for review at the following locations:
CALTRANS Website:
https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project-calendar.php?q=07-348504
Powell Constructors, Inc.
8555 Banana Ave.
Fontana, CA 92335
Phone (909) 356-8880
Fax (909) 356-1299 For More information or questions, please contact our estimator
Estimator: Joe Schulte Email Quotes: Estimate@powellconstructors.com
Requirements: Union Signatory, 100% Payment and Performance Bonds from an accepted surety may be required. Powell Constructors, Inc. will reimburse the subcontractor for bond premium up to 2%. Assistance in bonding, insurance, lines of credit or obtaining equipment, supplies, materials, or related assistance or services is available upon request. Subcontractors must possess a current contractor's license and provide GL, Auto and WC Insurance meeting the minimum requirements per the specifications. Subcontractors must also be registered with the Department of Industrial Relations (DIR) pursuant to the Labor Code section 1725.5.
Powell Constructors, Inc.
8555 Banana Ave.
Fontana, CA 92335
Phone (909) 356-8880
Fax (909) 356-1299
For More information or questions, please contact our estimator
Estimator: Joe Schulte
Email Quotes: Estimate@powellconstructors.com |