www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002

CE Focus - Focus Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date: April 8th, 2022 @ 10:50 a.m. through bid opening date

James McMinn, Inc (JMI) An Equal Opportunity Employer
Is requesting quotations from all qualified DBE
subcontractors and material suppliers firms performing commercially useful function for the following project:

Agency: Contract No. 07-323104
Project: Construction on State Highway in Los Angeles County in Irwindale and Azusa From 0.1 Mile East of Highland Avenue Undercrossing to South Citrus Avenue Overcrossing
Construct rock infiltration areas and maintenance vehicle pullouts.

DBE Goal: 18%
Estimated cost of the project is $5,100,000
Plans and Specs: http://ppmoe.dot.ca.gov/des/oe/weekly-ads/specs-ntb.php?c=07-323104
Wednesday, April 27, 2022 @ 2:00 PM

JMI is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: Progress Schedule (Critical Path Method), Time-Related Overhead (Wday), Dispute Resolution Advisor On-Site Meeting, Hourly Off-Site Dispute-Resolution-Advisor Related Tasks, Construction Area Signs, Traffic Control System, Channelizer (Surface Mounted), Temporary Railing (Type K), Alternative Temporary Crash Cushion, Temporary Crash Cushion Module, Job Site Management, Prepare Storm Water Pollution Prevention Plan, Rain Event Action Plan, Storm Water Sampling And Analysis Day, Storm Water Annual Report, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Silt Fence, Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Treated Wood Waste, Remove Concrete (Cy), Temporary High-Visibility Fence, Clearing And Grubbing (Ls), Roadway Excavation, Roadway Excavation (Type Z 2) (Aerially Deposited Lead), Roadway Excavation (Type Z-3) (Aerially Deposited Lead), Roadside Clearing, Slow Release Fertilizer, Plant (Group H), Plant (Group A), Plant Establishment Work, Wood Mulch, Check And Test Existing Irrigation Facilities, Operate Existing Irrigation Facilities, 1" Remote Control Valve, Battery Powered Irrigation Controller, 3" Backflow Preventer Assembly, Riser Sprinkler Assembly, (F) - 3/4" Plastic Pipe (Schedule 40) (Supply Line), (F) - 1" Plastic Pipe (Schedule 40) (Supply Line), (F) - 1 1/4" Plastic Pipe (Schedule 40) (Supply Line), (F) - 2" Plastic Pipe (Schedule 40) (Supply Line), Ball Valve, Class 3 Aggregate Base (Cy), Lean Concrete Base, Hot Mix Asphalt (Type A), Rubberized Hot Mix Asphalt (Gap Graded), Tack Coat, (F) - Structural Concrete, Headwall, (F) - Minor Concrete (Minor Structure), Dpp Infiltration Area (Rock), Earthwork (Infiltration Gallery), 36" Perforated Plastic Pipe (Infiltration Gallery), Class 6 Permeable Material (Infiltration Gallery), Import Borrow (Infiltration Gallery), Class 2 Aggregate Base (Infiltration Gallery), Structural Concrete Drainage Inlet (Infiltration Gallery), Miscellanous Iron And Steel (Infiltration Gallery), 12" Plastic Pipe, 18" Corrugated Steel Pipe (.079" Thick), 18" Steel Flared End Section, 36" Precast Concrete Pipe Inlet, Remove Pipe (Lf), Rock Slope Protection (150 Lb, Class Iii, Method B) (Cy), Rock Slope Protection (20 Lb, Class I, Method B) (Cy), Rock Slope Protection Fabric (Class 8), Minor Concrete (Gutter) (Cy), (F) - Miscellaneous Iron And Steel, Chain Link Fence (Type Cl-6), 12' Chain Link Gate (Type Cl-6), Remove Fence, Guard Railing Delineator, Treatment Best Management Practice Marker, Midwest Guardrail System (Wood Post), Vegetation Control (Minor Concrete), End Anchor Assembly (Type Sft), Alternative In-Line Terminal System, Remove Guardrail, Maintaining Existing Traffic Management System Elements During Construction, Modifying Lighting Systems, Modifying Sign Illumination Systems, Mobilization

If you have any questions, please contact Oscar Alegre
oscar@jmige.com estimating@jmige.com
***All quotes should be sent before 1pm on bid day***

Requirements: No Contractor or Subcontractor shall be qualified to bid on, be listed in a bid proposal or engage in the performance of any contract for public work, unless currently registered to perform public work with the Dept of Industrial Relations https://efiling.dir.ca.gov/PWCR/Search.action

JMI will pay for bond premium up to 1.5%. The US Small Business Administration may also assist you in obtaining bonding - please see the following site for information: http://www.sba.gov/content/contractors# 100% performance and payment bonds may be required for the full amount of subcontract price. JMI is willing to break down items into economically feasible packages and we are willing to break out any portion of work to encourage participitation.

Subcontractors must possess a current contractor’s license, insurance and worker’s compensation coverage meeting JMI's requirements Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies. JMI intends to work cooperatively with all qualified firms seeking work on this project.

*PLEASE PROVIDE DIR # WITH QUOTE*

Portions of work can be made available upon request prior to bid date. Please call if any assistance is needed.

James McMinn, Inc. (JMI)
License 878920
21834 Cactus Ave, Riverside, Ca 92518
Phone: (909) 514-1231 fax (909) 514-0553

 

Published on April 8th, 2022 @ 10:50 a.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 
What are we about? Contact us HOME