Contractors Estimate.com
Saving contractors time and money by delivering complete bid estimates.

 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

Advertisement date: September 27th, 2017 @ 9:03 a.m. through bid opening date

NORTHERN PACIFIC CORP.

550 Gateway Drive

Suite 104

Napa, California

An Equal Opportunity Employer
Is requesting quotations from all qualified DBE Sub-contractors and Material suppliers performing commercially useful functions for the following project:

Caltrans Project No. 04-4G8714 Federal Aid No. ACBRNH-Q101(327)E

                                     Project Name: CONSTRUCTION ON STATE HIGHWAY IN MARIN
COUNTY AT MARINWOOD NEAR SAN RAFAEL AT MILLER CREEK BRIDGE.

Project Description: BRIDGE SCOUR MITIGATION

  DBE goal  17%

Project Location: District-County-Route-Post Mile: 04-Mrn-101-15.4
                                        
   BID DATE: Tuesday, October 24, 2017 @ 2:00 PM

Submit quotes by: October 23 @ 5:00 pm


Complete the work, including plant establishment work, within 310 working days.


 The estimated cost of the project is $680,000.00

Your company’s certification must be current with Caltrans. We require a copy of your CURRENT CERTIFICATION with your quote.


NPC IS AVAILABLE TO DISCUSS BREAKING OUT PORTIONS OF WORK TO ENCOURAGE DBE PARTICIPATION

This request includes the following but not limited to:
Trucking, lead compliance plan, CAS, traffic control system, channelizer (surface mounted), portable CMS, temp. K-rail, temp. alt. crash cushion system, jobsite management, prep. WPCP, temp. cover, temp. fiber roll, temp. silt fence, temp. const. entrance, temp. const. roadway, water quality sampling/analysis day, water quality monitoring report, water quality annual report, temp. creek diversion system, temp. high visibility fence, clear & grub, roadway exc., rootwad revetment, roadside clearing, soil amendment, packet fertilizer, group H/I/A plants, plant establishment work, wood mulch, foliage protector, 1” wye strainer assembly, riser sprinkler assembly, drip valve assembly, cam coupler assembly, ¾” and 1”schedule 40 plastic pipe (supply line), move-in/out erosion control, rolled erosion control (netting), hydromulch, fiber rolls, hydroseed, compost, incorporate materials, RSP (1/4 T, CL. V and 60 LB., CL. II Method B), Cl ass 8 RSP fabric, type CL-6 chain link fencing, removal of fencing, mobilization.

Dan Palmer (cell 707.732.1715 dan.palmer@northern-pacific.com) is the estimator bidding this project. He is available to answer any questions regarding scope of work, interpretation of plans, specs, bid process. NPC may also offer assistance in obtaining bonds, lines of credit, insurance, necessary equipment, materials, supplies, etc. NPC may also require payment and performance bonds. NPC will pay bond premiums up to 1-1/2% of contract cost. NPC is a NON-UNION contractor. All subcontractors performing labor on this project must pay PREVAILING WAGES and submit CERTIFIED PAYROLL REPORTS. Plans and specs can be viewed and downloaded from the Caltrans website http://www.dot.ca.gov/workingct.html, can be viewed at local plan rooms, builder’s exchanges or our office at 550 Gateway Drive, Suite 104, Napa, California.


INSURANCE REQUIREMENTS (including but not limited to):NPC requires to be named as additionally insured on all insurance certificates and primary and non-contributing wording on AI endorsement. Waiver of subrogation endorsement required for General Liability and Worker’s Compensation.


THIS IS A PREVAILING WAGE PROJECT


NORTHERN PACIFIC CORP. IS AN EQUAL OPPORTUNITY EMPLOYER

Phone: 707.939-0595 Fax: 707.940-4298

 

 

Published on September 27th, 2017 @ 9:03 a.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME