Contractors Estimate.com
Saving contractors time and money by delivering complete bid estimates.

 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS
Advertisement date: October 10th, 2017through bid opening date

Caltrans Project No: 04-4G6504 Federal Aid No. ACST-P001(629)E

Project Name: CONSTRUCTION ON STATE HIGHWAY IN SAN MATEO COUNTY ABOUT 11 MILES SOUTH OF PESCADERO CREEK ROAD AT 3.0 MILES SOUTH OF PIGEON POINT ROAD.

Project Description: Storm Damage Repair

DBE goal 14%


Project Location: District-County-Route-Post Mile: 04-SM-1-4.2
                                        
   BID DATE: Wednesday, November 8, 2017

This request includes the following but not limited to:
Lead Compliance Plan, Construction Area Signs, Traffic Control System, Temporary Pavement Marking (Paint), Temporary Traffic Stripe (Paint), Channelizer (Surface Mounted), Portable Changeable Message Sign (Ls), Temporary Railing (Type K), Temporary Alternative Crash Cushion, Job Site Management, Prepare Water Pollution Control Program, Temporary Cover, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Construction Entrance, Temporary Concrete Washout, Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste), Treated Wood Waste, Remove Concrete (Cy), Clearing And Grubbing (Ls), Roadway Excavation, Rolled Erosion Control Product (Netting), Hydromulch, Fiber Rolls, Hydroseed, Compost (Cy), Class 4 Aggregate Subbase, Hot Mix Asphalt (Type A), Geosynthetic Pavement Interlayer (Paving Fabric), Place Hot Mix Asphalt Dike (Type A), Place Hot Mix Asphalt Dike (Type C), Tack Coat, Remove Asphalt Concrete Dike, Cold Plane Asphalt Concrete Pavement, Structural Concrete, Drainage Inlet, 18" Alternative Pipe Culvert, 18" Corrugated Steel Pipe Downdrain (.109" Thick), Concrete (Ditch Lining), Miscellaneous Iron And Steel, Temporary Fence (Type Frog), Remove Pavement Marker, Delineator (Class 1), Pavement Marker (Retroreflective), Midwest Guardrail System (7' Post), Vegetation Control (Minor Concrete), End Anchor Assembly (Type Sft), Alternative Flared Terminal System, Remove Guardrail, 6" Thermoplastic Traffic Stripe, 8" Thermoplastic Traffic Stripe, Thermoplastic Pavement Marking, Remove Thermoplastic Traffic Stripe, Remove Thermoplastic Pavement Marking, 12" Rumble Strip (Asphalt Concrete Pavement), Mobilization

Published on October 10th, 2017 by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME