www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002

CE Focus - Focus Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date March 30, 2022 @ 2:30 p.m. through bid opening date


Papich Construction Company an Equal Opportunity Employer is requesting sub-bids from all qualified subcontractors and suppliers including certified DBE firms performing a commercially useful function for referenced project:

Agency: County of Monterey BRLO-5944(103)
Project: Hartnell Road Bridge Replacement Project
DBE Goal: 17%
Bids open Thursday, April 14, 2022 at 3:30 PM

General work description: The County of Monterey (County) - Department of Public Works, Facilities and Parks proposes to replace the existing two-lane Haitnell Road Bridge (Bridge No. 44C0110) (proposed project) over Alisa) Creek in Monterey County, California, with a wider bridge that meets current American Association of State Highway and Transportation Officials (AASHTO) requirements. The proposed project would also widen the roadway approaches for approximately 370 to 470 feet (ft) on the north and south ends of the bridge to conform to the replacement bridge width and profile. After construction, both the bridge and roadway approaches would contain two 12-ft lanes (one in each direction) and two 8-ft shoulders and would meet current AASHTO minimum speed standards.

The Engineer's Estimate for the construction cost is $2,888,087

Michele Marquez | Estimating Support Manager
Email: mmarquez@papichconstruction.com

Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Construction  Staking, Portable Changeable Message Sign, Lead Compliance Plan, Construction Area Signs, Traffic Control System, Prepare Storm Water Pollution Prevention Plan, Storm Water Annual Report, Temporary Fiber Roll, Temporary Construction Entrance, Temporary Concrete Washout, Water Quality Sampling And Analysis Day, Water Quality Monitoring Report, Water Quality Annual Report, Temporary Creek Diversion Systems, Contractor-Supplied Biologist (Ls), Temporary High-Visibility Fence, Clearing And Grubbing, Structure Excavation (Culvert), Structure Backfill (Culvert), Structure Backfill (Controlled Low-Strength  Material), Plant (Group H), Plant (Group M), Plant Establishment Work, Hydroseed, Class 2 Aggregate Base (Cy), Hot Mix Asphalt (Type A), Place Hot Mix Asphalt Dike (Type A), Structural Concrete, Bridge (Polymer Fiber), Structural concrete, Warped Wingwall, Structural concrete, Box Culvert, Bar Reinforcing Steel (Warped Wingwall), Bar Reinforcing Steel (Box Culvert), Bridge Removal, Class 2 Permeable Material (Blanket), Gabions, Rock Slope Protection Fabric (Class 8), Relocate Mailbox, Fence (Type Wm, Wood Post), Temporary Fence (Type Cl-6), Remove Fence, Remove Gate, Salvage Fence, Reconstruct Fence, Pavement Marker (Retroreflective), Remove Roadside Sign, Relocate Roadside Sign, Midwest Guardrail System, Vegetation Control Mat (Rubber Or Fiber), Terminal System (Type Skt), Transition Railing (Type Wb-31), Crash Cushion (Quadguard M10), Concrete Barrier (Type 836), Concrete Barrier (Type 842), 6" Thermoplastic Traffic Stripe, Irrigation Water Service Charges.

Requirements: At the time of the bid, all subcontractors must possess a valid and relevant California Contractors License, a valid DIR registration number, meet the project’s minimum insurance requirements, and be 100% bondable. All subcontractor, supplier, and trucking proposals must be in strict accordance with the project plans, specifications, and any addenda issued. In addition, all Supplier and Subcontractors will be required to execute Papich’s standard subcontract or purchase order agreement (available upon request). Waiver of Subrogation will be required. Papich is a signatory contractor and will require a one-time job agreement for any non-union Subcontractors. Submission of a proposal shall constitute subcontractor, supplier, or trucker acceptance of all terms as listed above. Any attempted deviation or revision to said terms shall not be recognized by Papich. Papich can offer DBE/DVBE/SB firms assistance with bidding this contract including but not limited to: reducing items of work into smaller scopes, providing reimbursement for payment/performance bond premiums, and providing assistance obtaining materials. All requests for assistance must be made prior to the project bid date. Additionally, DBE/DVBE/SB firms must possess a valid and current certification to be considered for this contract. Questions concerning above requirements should be directed to our office prior to submission of a proposal.

Heavy Civil | Oil & Gas | Power | Site Development | Transportation
398 Sunrise Terrace | Arroyo Grande, CA 93420
Phone: 805-473-3016 Fax: 805-481-5966

Published on March 30, 2022 @ 2:30 p.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 
What are we about? Contact us HOME