USS Cal Builders is seeking qualified DVBE subcontractors, suppliers and firms to meet or exceed the 3%  goal for the Caltrans 08-1H2304 - CONSTRUCTION ON STATE HIGHWAY IN SAN BERNARDINO COUNTY AT VARIOUS LOCATIONS In District 08 On Route 10, 15, 71 and 83

Bid Date and Time:

APRIL 12, 2018 @ 2PM

Project Owner:

CALTRANS

Engineer’s Estimate:

$1.27 Million

Estimator’s Name:

JIM LARREA

Email Address:

bidding@usscalbuilders.com

Estimator's Phone:

(714) 828-4882 Ext. 3

Estimator’s Fax:

(714) 503-6805

Plans and Specs Link:

http://www.dot.ca.gov/des/oe/weekly-ads/plans.php?id=08-1H2304

The Work includes, but is not limited to: LEAD COMPLIANCE PLAN, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN (LS), JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, TEMPORARY CONCRETE WASHOUT, REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE), TEMPORARY DECKING, STRUCTURAL CONCRETE, BRIDGE (RSC), CLEAN EXPANSION JOINT, JOINT SEAL (MR 1"), JOINT SEAL (MR 1 1/2"), JOINT SEAL ASSEMBLY (MR 4"), JOINT SEAL (MR 2"), BONDED JOINT SEAL (MR 2"), BAR REINFORCING STEEL (BRIDGE), PUBLIC SAFETY PLAN, RAPID SETTING CONCRETE (PATCH), REMOVE UNSOUND CONCRETE, PREPARE CONCRETE BRIDGE DECK SURFACE, TREAT BRIDGE DECK, FURNISH BRIDGE DECK TREATMENT MATERIAL, ACCESS OPENING, SOFFIT, BRIDGE REMOVAL (PORTION), PAINT BRIDGE IDENTIFICATION, MISCELLANEOUS METAL (BRIDGE), REMOVE PAVEMENT MARKER, PAVEMENT MARKER (RETROREFLECTIVE), THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), PAINT TRAFFIC STRIPE (2-COAT), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), REMOVE THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOPLASTIC PAVEMENT MARKING.

USS Cal Builders requires 100% Performance & Payment Bonds. If requested, and as USS Cal Builders way of assisting subs in obtaining bonds, lines of credit and insurance in the preparation of this project, we can initiate introduction to agents known to us. USS Cal can also assist in obtaining equipment, supplies, materials or related assistance or services in the preparation of this project. USS Cal is relying on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope found in the plans, specifications and addenda regardless of any qualifying language in the proposal. USS Cal's listing of a subcontractor is not an acceptance of any or all of that subcontractor's conditions, qualifications, exclusions or exceptions included in the subcontractor's bid proposal. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor's bid must remain valid with the owner, as specified in the project's specifications.

Each listed subcontractor must execute USS Cal's standard subcontract agreement if USS Cal is awarded the project; the standard subcontract is available for review on USS Cal's website (www.usscalbuilders.com ) and at USS Cal's office. At the discretion of USS Cal, any listed subcontractor that withdraws its bid after USS Cal submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor.

This is a prevailing wage project. If this project is subject to a Project Labor Agreement or Project Stabilization Agreement, you will be required to honor the terms of such agreement. USS Cal Builders, Inc. is signatory to the Carpenter's Union. Any subcontractor performing carpentry work must be signatory to the Carpenter's Union.

An Equal Opportunity Employer.

 

Sincerely,

Bidding Department
USS Cal Builders Inc.

 

Published on March 29, 2018 @ 3:50 pm by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME