
CA Contractors License #88
1128 Carrier Parkway Avenue
Bakersfield, CA 93308
Griffith Company is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to:
Agency: CITY OF WASCO
Project: PALM AVENUE REHABILITATION
CML 5287 (058M) -A RGALO AVE. TO GROMER RD.
STPHIPL 5287 (059J) A -C KSON AVE. TO GROMER
DBE Goal: 21%
Bid Date: April 06, 2023 @ 2:00
Plans and Specs:
https://www.dropbox.com/scl/fo/riwtrbi851rzt3bccppmt/h?dl=0&rlkey=mefdmkn4f4aqx52o8xlbw14ys
Quotes for Services and Supplies requested for the following items for bid including, but not limited to
CML 5287 (058): "CLEARING & GRUBBING, SITE DEMOLITION, GRADING, BALANCE SITE TO NEW GRADE, CUT & HAUL-OFF EXCESS MATERIALS" SCARIFY NATIVE, GRADE AND COMPACT TO 95%, FOR C&G AND ROADWAY SCARIFY NATIVE, GRADE AND COMPACT TO 90%, FOR SIDEWALKS AND RAMPS CLASS 2 AGG. BASE COMPACTED TO 95% TYPE "A" HOT MIX ASPHALT APPLY FOG SEAL INSTALL CURB AND GUTTER - (6"x24") INSTALL 4-IN THICK CONC. SIDEWALK REMOVE AND REPLACE ADA CURB RAMP INSTALL 12" LIMIT LINE - THERMOPLASTIC INSTALL 6" BIKE LANE LINE - DETAIL 39 & 39A - THERMOPLASTIC INSTALL WHITE PAVEMENT MARKINGS – THERMOPLASTIC FURNISH AND INSTALL R1-1 SIGN - (30"x30") FURNISH AND INSTALL R2-1 SIGN - (24"x30") (35 MPH) FURNISH AND INSTALL R7-9 SIGN - (12"x18") "ADJUST/RELOCATE EXISTING SIGN, FURNISH AND INSTALL NEW POLE, REQUIRED MOUNTING HARDWARE AND FOOTING." CONSTRUCTION SURVEY/STAKING/RECORD DRAWINGS
QUALITY CONTROL PROGRAM PREPARE AND IMPLEMENT WATER POLLUTION CONTROL PLAN TEMPORARY TRAFFIC CONTROL
STPHIPL 5287 (059): "SITE DEMOLITION, GRADING, BALANCE SITE TO NEW GRADE, CUT & HAUL-OFF EXCESS MATERIALS" COLD PLANE 3" EXISTING AC SURFACE AND HAUL OFF SITE CHIP SEAL SCARIFY NATIVE, GRADE AND COMPACT TO 95%, FOR ROADWAY CLASS 2 AGG. BASE COMPACTED TO 95% TYPE "A" HOT MIX ASPHALT APPLY FOG SEAL ADJUST SURVEY MONUMENT TO GRADE ADJUST WATER VALVE TO GRADE INSTALL 12" LIMIT LINE – THERMOPLASTIC INSTALL 12" SOLID WHITE/YELLOW CROSS WALK STRIPE - THERMOPLASTIC INSTALL 24" SOLID WHITE/YELLOW CROSS WALK STRIPE - THERMOPLASTIC APPLY YELLOW CENTER LINE - DETAIL 2 – THERMOPLASTIC APPLY YELLOW CENTER LINE - DETAIL 15 - THERMOPLASTIC APPLY YELLOW CENTER LINE - DETAIL 22 – THERMOPLASTIC INSTALL 6" BIKE LANE LINE - DETAIL 39 & 39A - THERMOPLASTIC INSTALL 8" WHITE CHANNELIZING STRIPE - DETAIL 38 - THERMOPLASTIC INSTALL WHITE PAVEMENT MARKINGS – THERMOPLASTIC FURNISH AND INSTALL R7-9 SIGN - (12"x18") FURNISH AND INSTALL R81(CA) SIGN - (24"x18") FURNISH AND INSTALL R81A(CA) SIGN - (12"x5")
Griffith Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.
Requirements: Griffith Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and Carpenters Unions. 100% performance and payment bonds required for the full amount of the subcontract price. Subcontractors must possess a current contractor’s license, insurance and worker’s compensation insurance coverage meeting Griffith’s requirements. A copy of the insurance requirements and agreements can be obtained by contacting the Estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies. Griffith Company intends to work cooperatively with all qualified firms seeking work on this project. Griffith Company is an Equal Opportunity Employer.
Griffith Company
Estimator: Scott Miles
Email: smiles@griffithcompany.net
CA Contractors License #88
1128 Carrier Parkway Avenue Bakersfield, CA 93308
Phone: 661-392-6640 Fax: 661-393-9525 |