
License No. 266222
4225 Garner Road Riverside, CA 92501
Phone: 951-682-8308 Fax: 951-682-5872
Riverside Construction Company, Inc. an Equal Opportunity Employer Is requesting quotations from all qualified DVBE/SBE Sub-contractors and Material suppliers performing commercially useful functions for the following project:
Agency: The Metropolitan Water District of Southern California – 2174
Project: Diamond Valley Lake Holland Road Storm Drainage Improvements
Location: Winchester Riverside, CA
Bids Due 04/07/26 at 2:00 PM
Engineers Estimate: $1,100,000 and $1,500,000
Bid docs available on online: https://vendors.planetbids.com/portal/16151/bo/bo-detail/138808
25% SBE/DVBE Goal
Scope of Services: The work consists of a drainage improvements including a approximately 2,500 linear feet of 24-inch diameter HDPE line, manholes, confluence structure, and other appurtenant work as specified and shown on the drawings.
Bid docs available on online: https://vendors.planetbids.com/portal/16151/bo/bo-detail/138808
Lead Estimator: Bryan Lounsbury
Email: estimating@rivconstruct.com
Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Concrete, Pipe Supply, Concrete Supply, Reinforcement and Aluminum Railing, Trucking
Riverside Construction Company, Inc is willing to break items of work into smaller increments to assist DVBE/SBE Contractors and Suppliers in obtaining work on this project. Riverside Construction Company, Inc. is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. Riverside Construction Company, Inc. is interested in soliciting in Good Faith, including assistance in obtaining bonds, lines of credit, insurance, necessary equipment, materials and/or supplies. Include with your bid the Time required for Performance of your work and any Delivery Schedules so that we can establish a Flexible Timeframe for your work. Subcontractors may be required to furnish performance and payment bonds in the full amount of their subcontract by an admitted surety and subject to approval by our estimating department. A Worker’s Compensation Waiver of Subrogation will be required. Conditions or exceptions in Subcontractor’s quote are expressly rejected unless accepted in writing. Subcontractor scope (including any conditions or exceptions) is required 24 hours prior to bid deadline to allow proper evaluation. Quotes are required to be in accordance with the plans and specifications and good for the contract duration as specified in the bid documents. In order to assist DBE contractors and suppliers, Riverside Construction Company will divide bid items into smaller tasks or quantities when feasible to facilitate maximum Participation.
Riverside Construction Company, Inc.
License No. 266222
4225 Garner Road Riverside, CA 92501
Phone: 951-682-8308 Fax: 951-682-5872 |