Advertisement date February 28th, 2023 @ 2:07 p.m. through bid opening date

License No. 626859
5400 Hanna Ranch Road Novato, CA 94945
Phone: 415.456.8972 Fax: 415.459.0665

THOMPSON BUILDERS CORPORATION is requesting bids from ALL subcontractors, suppliers & truckers, for the following project:

Agency: East Bay Municipal Utility District | Project/Contract Number: SD446
Project: Main Wastewater Treatment Plant Secondary Clarifier Rehabilitation Phase 3
The Engineer's estimate is $5,600,000 to $8,400,000.
Bids open Wednesday, March 29, 2023, at 1:30 PM

Project Description: Work includes: (1) Rehabilitating Clarifiers 4 and 7 by replacing the clarifier equipment, refurbishing the bridge, resurfacing the concrete surfaces, rebuilding drives, and replacing electrical equipment, (2) installing new sump pits in Clarifiers 3, 4, 7, 10 and 11, (3) installing new sump pumps in Clarifiers 1, 3, 4, 7, 10 and 11, (4) installing safety access gates on the Clarifiers 1-7 and 9-11 railings, (5) replacing light pole lighting with LEDs and new wiring, (6) providing new 120V, 208V, and 480V and control wiring for Clarifiers 1-7 and 9-10, (7) providing and installing new signal wiring for the flow meters for Clarifiers 1-12, and (8) inspecting clarifier return activated sludge pipeline and providing Cure-In-Place Piping rehabilitation if required.

Plans and specifications may be emailed upon request or downloaded from the following link: https://tpcorp.box.com/s/0f65xik2efvdzrqj76sc9fqf4y9qy19a

Quotes for Services and Supplies requested for the following items for bid including, but not limited to Construction Surveying, Selective Site Demolition, Lead Hazard Control Activities, Resurfacing Of Cast-In-Place Concrete, Concrete Repair, Concrete Forming, Expansion Joint, Waterspots, Concrete Reinforcement, Cast-In-Place Concrete, Non-Shrink Grouting, Epoxy Injection Grouting, Hot-Dip Galvanizing, Shop And Field Welding, Flange Bolting, Structural Steel Framing, Mechanical Metal Supports, Metal Fabrications, Anchor Systems, Glass-Fiber- Reinforced Plastic, Painting And Coatings, Pipe Identification, Submersible Sump Pumps, Low-Voltage Electrical Power Conductors And Cables, Grounding And Bonding For Electrical Systems, Raceway And Boxes For Electrical Systems, Underground Ducts Raceways For Electrical Systems, Identification For Electrical Systems, Low Voltage Motors, Commissioning Of Electrical Systems, Lighting Control Devices, Low-Voltage Distribution Transformers, Panelboards, Motor Control Centers, Enclosed Switches And Circuit Breakers, Across-The-Line Motor Controllers, Lighting Fixtures, Lamps, Leds, And Ballasts3 , Imported Backfill And Drainrock Materials, Trenching And Backfilling, Cctv Inspection Of Sewers, Sewer Pipe Cleaning, Rehabilitation Of Existing Sewer With Cured-In-Place Pipe, Basic Mechanical Materials And Methods, Miscellaneous Valves, Ductile Iron Process Piping, Mechanical Piping, Process Control Panels And Hardware, Secondary Clarifier Equipment

*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement.  Certification of insurance for General Liability and Workers’ Compensation are required.  A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors’ faithful performance and payment bonds in the amount of the subcontract price will be required.  Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation.

TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding.

Thompson Builders Corporation is an Equal Opportunity Employer
 Contact: Leah Oba
PHONE: (415) 456-8972     FAX: (415) 459-0665

EMAIL:  bids@tbcorp.com

Published on February 28th, 2023 @ 2:07 p.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 