www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002

CE Focus - Focus Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date: February 16th, 2021 @ 1:07 p.m through bid opening date

CA Contractors License #88
1128 Carrier Parkway Avenue
Bakersfield, CA 93308

Griffith Company an Equal Opportunity Employer is requesting sub-bids from all qualified subcontractors and suppliers including certified DBE firms performing a commercially useful function for referenced project:

Project: Construction on State Highway In Tulare County In And Near Tulare From Prosperity Avenue Overcrossing To 1.2 Miles South Of Avenue 280 Overcrossing
Agency: Caltrans
Contract No. 06-360244
Bid Date: Wednesday, March 10, 2021 at 2:00 PM
DBE Goal: 14%

General work description: Widen freeway and bridges, construct concrete bridge.
District-County-Route-Post Mile: 06-Tul-99-30.6/35.2
Plans & Specs can be viewed online at:

http://ppmoe.dot.ca.gov/des/oe/weekly-ads/specs-ntb.php?c=06-360244

***Addendum 1 was issued 2/26/2021***
***Addendum 2 was issued 3/03/2021***

http://ppmoe.dot.ca.gov/des/oe/weekly‐ads/addendum.php?id=06‐360244

Griffith Company an Equal Opportunity Employer requests subquotes from all qualified subcontractors and suppliers including certified DBE firms performing commercially useful function for the following items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Type III Barricade, Channelizer, Portable Radar Speed Feedback Sign System Day, Temporary Pavement Marker, Portable Changeable Message Sign, Temporary Railing (Type K), Temporary Crash Cushion Module, Temporary Alternative Crash Cushion System, Temporary Radar Speed Feedback Sign System, SWPPP, Temporary Hydraulic Mulch (Bonded Fiber Matrix), Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Water Quality Sampling and Analysis, Walter Quality Monitoring Report, Asbestos Compliance Plan, Remove Yellow Thermo Traffic Stripe (Hazardous Waste), Temporary High Visibility Fence, Clearing & Grubbing, Roadway Excavation, 24” Trenchless Culvert Installation, Shoulder Backing, Structure Excavation (Bridge), Structure Backfill (Bridge), Bonded Fiber Matrix, Compost, Incorporate Materials, Class II Agg Base, HMA (Type A), Rubberized HMA, Place HMA Dike, Tack Coat, Remove Asphalt Concrete Dike, Cold Plane Asphalt Furnish Piling, Drive Pile, 60” CIDPH (Sign Foundation), Prestressing Cast in Place Concrete, Prestressing, Structural Concrete, Structural Concrete (Bridge Footing, Bridge, Polymer Modified, Approach Slab Type N, Box Culvert, Drainage Inlet), Drill and Bond Dowel, Join Seal Assembly, Bar Reinforcing Steel, Furnish Sign Structure, Install Sign Structure (Truss), Remove Sign Structure, Sound Wall (Masonry Block), Remove Asphalt Concrete Surfacing, Prepare Concrete Bridge Deck Surface, Refinish Bridge Deck, Core Concrete (5”), Abandon Bridge Deck Drain, Bridge Removal, 24” Reinforced Concrete Pipe, 18” Corrugated Steel Pipe, Welded Steel Pipe Casing (Bridge), 24” Concrete Flared End Section, Slope Paving (Fractured Rock), Gabion, Rock Slope Protection, Minor Concrete (Textured Paving), Remove Concrete (Curb, Gutter and Sidewalk), Misc. Iron & Steel, Prepare and Paint Concrete, Prepare and Stain Concrete, Fence, 12’ Wire Mesh Gate, Remove Fence, Remove Pavement Marker, Delineator (Class II), Pavement Marker (Retroreflective), Barrier Maker, Object Marker, Remove Roadside Sign, Reset Roadside Sign, Relocate Roadside Sign, Furnish Formed Panel Sign (Overhead), Furnish Laminated Panel Sign, Furnish Single Sheet Aluminum Sign, Metal, Roadside Sign – One Post & Two Post, Install Sign (Strap & Saddle Bracket Method), Install Sign Panel on Existing Beam Barrier (Steel Post), Cable Railing, Transition Railing (Type WB-31), End Anchor Assembly, Alternative In Line Terminal System, Alternative Crash Cushion System, Concrete Barrier, Remove Guardrail, Remove Concrete Barrier, Thermoplastic Pavement Marking, 6” Thermo Traffic Stripe, 6” Thermo Traffic Stripe, Paint Traffic Stripe, 6” Thermo Traffic Stripe, 8” Thermo Traffic Stripe, Remove Painted Traffic Stripe, Remove Thermoplastic Traffic Stripe, Remove Thermo Pavement Marking, 12” Rumble Strip (Asphalt Concrete Pavement), Traffic Stripe Black, 6” Traffic Stripe with Contrast , 6” Traffic Stripe Tape with Contrast, Maintaining Existing Traffic Management System Elements During Construction, Traffic Monitoring Station, Conduit System, Modifying Lighting Systems, Modifying Signal and Lighting Systems, Hauling

Please call if you need any bidding assistance including but not limited to; obtaining bonding, insurance, equipment, materials and/or supplies. Griffith Company intends to work cooperatively with all qualified DBE firms seeking work on this project.

Griffith Company is signatory to the following unions: Operating Engineers, Carpenters, Cement Masons, Laborers, & Teamsters. We are an Equal Opportunity Employer. Griffith Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Subcontractors must possess a current contractor’s license, DIR registration number, insurance and worker’s compensation

Griffith Company
Estimator: Scott Miles Email: smiles@griffithcompany.net
CA Contractors License #88
1128 Carrier Parkway Avenue Bakersfield, CA 93308
Phone: 661-392-6640 Fax: 661-393-9525

Published on February 16th, 2021 @ 1:07 p.m by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 
What are we about? Contact us HOME