Advertisement date January 12th, 2023 @ 4:00 p.m. through bid opening date

CA Contractors License #88
12200 Bloomfield Ave. 
Santa Fe Springs, Ca. 90670

Griffith Company an Equal Opportunity Employer is requesting sub-bids from all qualified subcontractors and suppliers including certified DBE firms performing a commercially useful function for referenced project: 

Contracting Agency: Caltrans
Project No. 07-3255U4
In District 07 On Route 605
Project: Construction on State Highway In Los Angeles County In Baldwin Park And Irwindale From Route 10/605 Separation To 0.2 Mile North Of Route 210/605 Separation

Bids open February 16, 2023 @ 2:00 PM
Bids open February 28, 2023 @ 2:00 PM

Bids open March 7, 2023 @ 2:00 PM

DBE Goal: 22%
The estimated cost of the project is $17,300,000

**Addendum 1 issued 2/03/2023**
**Addendum 2 issued 2/15/2023**
**Addendum 3 issued 2/23/2023**
**Addendum 4 issued 2/27/2023**
**Addendum 5 issued 3/02/2023**

Project Description: Individual slab replacement, cold plane AC and place rubberized HMA.

Plans/Specs/Addendums can be viewed for free online at:https://www.dropbox.com/scl/fo/w86v3rdiqsplnwq8efjf6/h?dl=0&rlkey=pcogj4cuhrc96ck2218xieauz

Griffith Company an Equal Opportunity Employer requests sub quotes from all qualified subcontractors and suppliers including certified DBE firms performing commercially useful function for the following items of work, including but not limited to: LEAD COMPLIANCE PLAN, TIME-RELATED OVERHEAD, DISPUTE RESOLUTION BOARD ON-SITE MEETING, HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD-RELATED TASKS, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, CHANNELIZER (SURFACE MOUNTED), PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY, TEMPORARY PEDESTRIAN ACCESS ROUTE LS LUMP SUM, TEMPORARY RAILING (TYPE K), TEMPORARY CRASH CUSHION MODULE, TEMPORARY RADAR SPEED FEEDBACK SIGN SYSTEM, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION, PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL), TEMPORARY COVER, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY GRAVEL BAG BERM, TEMPORARY SILT FENCE, TEMPORARY CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, TREATED WOOD WASTE, REMOVE CONCRETE, ROADWAY EXCAVATION, ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD), ROADSIDE CLEARING, PRUNE EXISTING PLANTS, ROCK BLANKET, SOIL AMENDMENT, SLOW-RELEASE FERTILIZER, PLANT (GROUP A), TREE PROTECTION, PLANT ESTABLISHMENT WORK, WOOD MULCH, CHECK AND TEST EXISTING IRRIGATION FACILITIES, REMOVE IRRIGATION FACILITY, CONTROL AND NEUTRAL CONDUCTORS, 1 1/2" REMOTE CONTROL VALVE, RISER SPRINKLER ASSEMBLY (GEAR DRIVEN), POP-UP SPRINKLER ASSEMBLY (GEAR DRIVEN), (F) - 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE ), (F) - 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), (F) - 1 1/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), (F) - 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), (F) - 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), (F) - 2" PLASTIC PIPE (CLASS 315) (SUPPLY LINE), BALL VALVE, ROLLED EROSION CONTROL PRODUCT (JUTE MESH), FIBER ROLLS, CLASS 3 AGGREGATE BASE, LEAN CONCRETE BASE RAPID SETTING, SLURRY SEAL, HOT MIX ASPHALT (TYPE A), RUBBERIZED HOT MIX ASPHALT (GAP GRADED), PLACE HOT MIX ASPHALT DIKE, TACK COAT, REMOVE ASPHALT CONCRETE PAVEMENT, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT, JOINTED PLAIN CONCRETE PAVEMENT (RSC), DRILL AND BOND (DOWEL BAR), INDIVIDUAL SLAB REPLACEMENT (RSC), 60" CAST-IN-DRILLED-HOLE CONCRETE PILE (SIGN FOUNDATION), (F) - MINOR CONCRETE, (F) - MINOR CONCRETE (MINOR STRUCTURE), FURNISH SIGN STRUCTURE (VERSATILE TRUSS), INSTALL SIGN STRUCTURE (VERSATILE TRUSS), REMOVE SIGN STRUCTURE WALKWAY (EA), REMOVE SIGN STRUCTURE (EA), DESIGN POLLUTION PREVENTION, INFILTRATION AREA (ROCK INFILL), 18" CORRUGATED STEEL PIPE (.079" THICK), 18" ENTRANCE TAPER, 18" STEEL FLARED END SECTION, REMOVE INLET, ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B), ROCK SLOPE PROTECTION FABRIC (CLASS 8), MINOR CONCRETE (CURB AND GUTTER), MINOR CONCRETE (CURB, SIDEWALK AND CURB RAMP), REMOVE CONCRETE (CURB AND GUTTER), (F) - MISCELLANEOUS IRON AND STEEL, REMOVE DELINEATOR, DELINEATOR (CLASS 2), GUARD RAILING DELINEATOR, PAVEMENT MARKER (RETROREFLECTIVE), TREATMENT BEST MANAGEMENT PRACTICE MARKER, OBJECT MARKER (TYPE N), OBJECT MARKER (TYPE L-1), REMOVE MARKER, REMOVE ROADSIDE SIGN (WOOD POST), REMOVE ROADSIDE SIGN (METAL POST), REMOVE ROADSIDE SIGN (STRAP AND SADDLE BRACKET METHOD), FURNISH FORMED PANEL SIGN (OVERHEAD), FURNISH LAMINATED PANEL SIGN (1"-TYPE A), FURNISH LAMINATED PANEL SIGN (1"-TYPE B), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-FRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-FRAMED) ROADSIDE SIGN, ROADSIDE SIGN, INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD), INSTALL SIGN PANEL ON EXISTING FRAME, INSTALL ROADSIDE SIGN (LAMINATED WOOD BOX POST), FURNISH LAMINATED WOOD BOX POST (TYPE M), MIDWEST GUARDRAIL SYSTEM (WOOD POST), VEGETATION CONTROL (MINOR CONCRETE), TRANSITION RAILING (TYPE WB-31), END ANCHOR ASSEMBLY (TYPE SFT-M), ALTERNATIVE IN-LINE TERMINAL SYSTEM, REMOVE GUARDRAIL, THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN MAINTAINING EXISTING TRAFFIC MANAGEMENT, SYSTEM ELEMENTS DURING CONSTRUCTION, TEMPORARY MICROWAVE VEHICLE DETECTION SYSTEM, MODIFYING LIGHTING SYSTEMS, MODIFYING SIGNAL AND LIGHTING SYSTEMS, MODIFYING RAMP METERING SYSTEMS, MODIFYING TRAFFIC MONITORING STATIONS, REMOVING SIGN ILLUMINATION SYSTEMS, CENSUS STATION, MOBILIZATION, TRUCKING, EQUIPMENT RENTAL.

Griffith Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. 

Requirements: Griffith Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and Carpenters Unions. 100% performance and payment bonds required for the full amount of the subcontract price. Subcontractors must possess a current contractor’s license, insurance and worker’s compensation insurance coverage meeting Griffith’s requirements. A copy of the insurance requirements and agreements can be obtained by contacting the Estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies. Griffith Company intends to work cooperatively with all qualified firms seeking work on this project. Griffith Company is an Equal Opportunity Employer.  


Griffith Company 
12200 Bloomfield Ave. Santa Fe Springs, Ca. 90670 
Phone 562-929-1128 Fax 562-864-8970 
Estimator: Jake Weigand, Estimator: jweigand@griffithcompany.net

Published on January 12th, 2023 @ 4:00 p.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 