Contractors Estimate.com
Saving contractors time and money by delivering complete bid estimates.

 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

Advertisement date January 2nd, 2018 @ 11:14 a.m. through bid opening date

USS Cal Builders is seeking qualified DBE subcontractors, suppliers and firms to meet or exceed the 26%  goal for the BART CONSTRUCTION OF HAYWARD MAINTENANCE COMPLEX PROJECT CENTRAL WAREHOUSE Project.

Bid Date and Time:

JANUARY 23, 2018 at 2:00 PM

Engineer’s Estimate:

$46-54 Million

Estimator’s Name:

FERNANDO MARQUEZ

Email Address:

bidding@usscalbuilders.com

Estimator's Phone:

(714) 828-4882 Ext. 3

Estimator’s Fax:

(714) 503-6805

Pre-bid Matchmaking Session:

January 9, 2018 at 3:30-6:00 PM

Plans and Specs Link:

https://suppliers.bart.gov/psp/BRFPV91/SUPPLIER/ERP/h/?tab=DEFAULT

 

 

 The Work includes, but is not limited to: Temporary Utilities, Construction Facilities, District Furnished Materials (DFM) and District Furnished Equipment (DFE), Demolition, Asbestos Abatement, Cast-in-Place Concrete, Reinforcing Steel, Concrete Masonry Unit, Steel Framing, Cold-Formed Metal Framing, Architectural Work, Industrial Storage Racks, Loading Dock Equipment, Residential Appliances, Industrial Equipment, Site Furnishings, Metal Building Systems, Hazmat Structures, Hydraulic Elevator, Facility Services, Fire Suppression, Plumbing, HVAC, Electrical Work, Communications Work, Electronic Safety and Security Work, Earthwork, Stockpile Removal, Vibro-Replacement Stone Columns, Bioretention, Aggregate Base Course, Asphalt Paving, Concrete Paving, Concrete Curbs, Gutters and Walks, Exterior Improvement Work, Chain Link Fences and Gates, Planting Irrigation, Planting, Utility Work.

If requested, USS Cal Builders can assist subs in obtaining bonds, lines of credit and insurance in the preparation of this
project. USS Cal can also assist in obtaining equipment, supplies, materials or related assistance or services in the preparation of this project. USS Cal is relying on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope found in the plans, specifications and addenda regardless of any qualifying language in the proposal. USS Cal's listing of a subcontractor is not an acceptance of any or all of that subcontractor's conditions, qualifications, exclusions or exceptions included in the subcontractor's bid proposal. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor's bid must remain valid with the owner, as specified in the project's specifications.

Each listed subcontractor must execute USS Cal's standard subcontract agreement if USS Cal is awarded the project; the standard subcontract is available for review on USS Cal's website (www.usscalbuilders.com ) and at USS Cal's office. At the discretion of USS Cal, any listed subcontractor that withdraws its bid after USS Cal submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor.

This is a prevailing wage project. If this project is subject to a Project Labor Agreement or Project Stabilization Agreement, you will be required to honor the terms of such agreement. USS Cal Builders, Inc. is signatory to the Carpenter's Union. Any subcontractor performing carpentry work must be signatory to the Carpenter's Union.

Bidding Department
USS Cal Builders Inc.

8051 Main Street, Stanton, CA 90680

License # 654454

www.usscalbuilders.com

 

Published on Janurary 2nd, 2018 @ 11:14 a.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME