Advertisement date: September 11th, 2017 @ 1:28 p.m through bid opening date

General work description: Bridge scour mitigation.
The Department will receive sealed bids for : CONSTRUCTION ON STATE HIGHWAY IN MENDOCINO

VARIOUS LOCATIONS

.
District-County-Route-Post Mile: 01-Men-20, 101, 128-Var


Contract No. 01-0C4304

Bids open Wednesday, October 4, 2017


The Contractor must have either a Class A license or any combination of the following Class C licenses
which constitutes a majority of the work: C-8, C-12.
The DVBE Contract goal is 5 percent.


Base Bid: $380,000.

40 Working Days

This project is looking for the following trades including but not limited to: LEAD COMPLIANCE PLAN, DEWATERING AND NON-STOP WATER DISCHARGE CONTROL, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN (LS), JOB SITE MANAGEMENT. PREPARE WATER POLLUTION CONTROL PROGRAM, MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL), TEMPORARY HYDRAULIC MULCH, TEMPORARY COVER, TEMPORARY FIBER ROLL, TEMPORARY CLEAR WATER DIVERSION SYSTEM, TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, PLANT (GROUP H), TRANSPLANT FALLEN ALDER TREE, BONDED FIBER MATRIX (SQFT), ROLLED EROSION CONTROL PRODUCT (NETTING), COMPOST (CY), INJECT CRACK (EPOXY), ROCK SLOPE PROTECTION (2T, METHOD A), ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY), ROCK SLOPE PROTECTION (1T, METHOD B), ROCK SLOPE PROTECTION (NO. 2, METHOD B) (CY), ROCK SLOPE PROTECTION (1/2 T, METHOD B) (CY), ROCK SLOPE PROTECTION FABRIC (CLASS 10), MINOR CONCRETE (MISCELLANEOUS CONSTRUCTION), REMOVE FENCE, RECONSTRUCT FENCE (TYPE WM), VEGETATION CONTROL (MINOR CONCRETE), TRANSITION RAILING (TYPE WB-31), END CAP (TYPE TC), SOFTSTOP TL-3, REMOVE GUARDRAIL, SALVAGE GUARDRAIL, MOBILIZATION.

 

 

Published on September11th, 2017 @ 1:28 p.m by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 